Tender Value
₹27.6 L
EMD Value
₹55,260
Closing Date
14 Aug 2026, 12:00 pmClosed
Commissioner
Municipal Council Deeg
Construction of a hall at the Deeg Municipal Council.
2026_DLB_586107_1
Enit 14 Nirman
Open Tender
Civil Works
Percentage
90 days
deeg
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
commissioner
₹55,260
Yes
17 Aug 2026
12 Aug 2026
14 Aug 2026
12 Aug 2026
14 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforcement for R.C.C. work at all levels including straightening,
cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. | 6,000 | kg | 83.3 | ₹4,99,800 |
| 2 | Centring and shuttering with plywood or steel sheet upto two stories( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers.(D.P.C) | 18.4 | Sqm | 426 | ₹7,838.4 |
| 3 | lintel | 18.4 | Sqm | 426 | ₹7,838.4 |
| 4 | stair | 18 | Sqm | 426 | ₹7,668 |
| 5 | Brick work with FPS bricks of class designation 75 in superstructure
above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) | 20.7 | CUM | 6,500 | ₹1,34,550 |
| 6 | A | 20.7 | CUM | 6,500 | ₹1,34,550 |
| 7 | L.S | 20 | CUM | 6,500 | ₹1,30,000 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories
( each story of height upto 3.5 metre from floor level) including
strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. | 90 | Sqm | 456 | ₹41,040 |
| 9 | A | 30 | Sqm | 456 | ₹13,680 |
| 10 | Reinforced cement concrete work in beams, suspended floors,
roofs having slope upto 15° landings, balconies, shelves, chajjas,
lintels, bands, plain window sills, staircases and spiral stair cases
upto two stories excluding the cost of centring, shuttering, finishing
and reinforcement: including Providing /mixing of synthetic fibers
compulsorily complying with IS 16481:2022 of 06 mm/12 mm length
to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg
Cement up to 900 gms per cum of Concrete/ mortarM-25 Grade Concrete (1:1:2 (1 cement : 1 coarse sand : 2 graded
stone aggregate 20 mm nominal size) -As per design mix) | 13.5 | CUM | 7,740 | ₹1,04,490 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1041123.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .