Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.0 LAccepted-AOC 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 2 | METTUR DAM | TAMIL NADU | ₹27.0 L Quoted ₹25.0 L | 1 | Accepted-AOC accepted |
| 2 | 2₹30.1 LRejected-AOC NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹30.1 L | 2 | Rejected-AOC Lowest 2 |
| Sl No | Description | Qty | Unit | KR CONTRACTOR L2 | SSS ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the existing rails after removing the steel keys, fish plates bolts and nuts in order to provide accessibility for grinding the edges. | 680 | mtr | 385 ₹2.6 L | 298 ₹2.0 L |
| 2.00 | Charges for grinding the elongated edges to right angle to provide the expansion gap in between rails. | 100 | edges | 492 ₹49,200 | 388 ₹38,800 |
| 3.00 | Charges for Pre-assembling and reversing the grounded rails in to its position fixing the Elastic railclip, fishplates, bolts and nuts etc. | 680 | mtr | 336 ₹2.3 L | 264 ₹1.8 L |
| 4.00 | Deep screening the existing ballast to remove the broken / damaged ballast for proper drainage of track line. | 275 | mtr | 356 ₹97,900 | 284 ₹78,100 |
| 5.00 | Lifting of track lines to the specific limit by through packing. | 275 | mtr | 172 ₹47,300 | 134 ₹36,850 |
| 6.00 | Charges for Levelling the track rail to zero, by checking and aligning the track rail with piano wire on one side and parallelism of another side rail and gauge correction to the RDSO standards etc.. | 275 | mtr. | 979 ₹2.7 L | 775 ₹2.1 L |
| 7.00 | Ballast hard broken stone 40mm size | 120 | m3 | 2,076 ₹2.5 L | 1,755 ₹2.1 L |
| 8.00 | Charges for dumping and spreading the ballast to the track. | 120 | m3 | 759 ₹91,080 | 626 ₹75,120 |
| 9.00 | Dismantling plain cement concrete | 90 | m3 | 676 ₹60,840 | 518 ₹46,620 |
| 10.00 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 100 | m3 | 158 ₹15,800 | 130 ₹13,000 |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
22 Oct 2025, 2:00 pmClosed
CE / MTPS-I
Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHPI Deep screening through packing Lifting the Track line ballast deficiency makeup work with 40mm hard broken stone ballast check rails at Wagon Tippler IV inhaul etc
2025_EB_612306_1
CE SE M II MTPS I CHPI OT 39 2025 2026
Open Tender
Miscellaneous Works
45 days
MTPS-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹29,000
Yes
13 May 2026
8 Oct 2025
23 Oct 2025
8 Oct 2025
22 Oct 2025
8 Oct 2025
Amount
Charges for dismantling the existing rails after removing the steel keys, fish plates bolts and nuts in order to provide accessibility for grinding the edges.
Charges for grinding the elongated edges to right angle to provide the expansion gap in between rails.
Charges for Pre-assembling and reversing the grounded rails in to its position fixing the Elastic railclip, fishplates, bolts and nuts etc.
Deep screening the existing ballast to remove the broken / damaged ballast for proper drainage of track line.
Lifting of track lines to the specific limit by through packing.
Charges for Levelling the track rail to zero, by checking and aligning the track rail with piano wire on one side and parallelism of another side rail and gauge correction to the RDSO standards etc..
Ballast hard broken stone 40mm size
Charges for dumping and spreading the ballast to the track.
Dismantling plain cement concrete
HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B
Fixing of check rails with C.I. blocks in railway track (This work includes cutting and drilling of checkrails, transporting of checkrails)
Charges for dismantling and refixing the PSC sleepers T2946 after providing PCC concrete 1:4:8 this work includes leading of PSC sleepers from stock area to track line area
Providing PCC 1:4:8 mix using 40mm HBG stone for foundation base conerete as directed by the department Engineer at site, including cost of all materials, all lead and lift, curing etc. complete in Wagon Tippler IV inhaul.
Providing PCC 1:2:4 concrete pavement in between railway track line including deep screening hard broken ballast in between track line, earth work excavation, providing well gravel bed, centering and shuttering, thermacool cost and transport of concrete mixture by using JCB in Wagon Tippler IV inhaul.
KR CONTRACTOR (BID ID -1490325)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_731658.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid