Tender Value
₹10.0 L
Closing Date
30 Sept 2021, 4:00 pmClosed
EXECUTIVE ENGINEER
O/O THE EXECUTIVE ENGINEER,EASTERN RIVERS DIVISION,PLOT NO. A 13 14,BHOINAGAR,CWC,BHUBANESWAR,751022
Construction of boundary wall and barbed wire fencing at site Jamsolaghat under Subarnarekha Sub Division, Balasore, ERD, CWC, MERO Bhubaneswar
2021_CWC_648830_1
ERD/JE-HQ/NIT/2021-22/1770-73
Open Tender
Civil Works
120 days
Bhubaneswar
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
24 Nov 2021
17 Sept 2021
1 Oct 2021
17 Sept 2021
30 Sept 2021
17 Sept 2021
Amount
Site clearence including excavation of old fencing posts, dismantling of gate pillar, barbed wires etc. and stacking at suitable lead upto 50 metres
Piling of diameter 250 mm upto depth of 2meters by manual method
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)
12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqmover and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. ISA 50X50X6 @ 4.47 kg/m
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for eparately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture in steel galvanised iron/steel works
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
AKSHYA KUMAR PATRA
Om Construction
CHITTA RANJAN DASH
SAROJ KUMAR DASH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx