| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAdmitted-Finance VILL SOBLI P O DEVNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹13.5 L | L1 | Admitted-Finance |
| 2 | L2₹14.2 L+₹74,964.99 (5.57%)Admitted-Finance VILLAGE URU P O SHINGLA TEHSIL RAMPUR DISTT SHIMLA | ₹14.2 L+₹74,964.99 (5.57%) | L2 | Admitted-Finance |
| 3 | L3₹14.7 L+₹1.2 L (9.17%)Admitted-Finance | ₹14.7 L+₹1.2 L (9.17%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S KEDAR BHALUNI L1 | M/s Prabhu Dyal L2 | M/S Satya Dev L3 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all classification of earth work such as pick work, jumper work. Blasting soft/hard rock or chiselling where blasting is prohibited and disposal of all excavated earth complete with in all leads and lifts & entire satisfaction of the Engineer-in-Charge.(Pick work 80% & Jumper work20%) | 104.35 | Cum | 445 ₹46,435.75 Lowest | 450 ₹46,957.5 | 460 ₹48,001 |
| 2.00 | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | 8.84 | Cum | 475 ₹4,199 Lowest | 500 ₹4,420 | 520 ₹4,596.8 |
| 3.00 | Excavation in foundations, trenches etc.. in earth work lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc.conslidating each deposited layer by ramming & watering & then disposing of all surplus excavatedearth as directed within a lead of 20 metres complete in all respect as per entire atisfaction of Engineer in Charge. | 91.42 | cum | 635 ₹58,051.7 | 630 ₹57,594.6 Lowest | 650 ₹59,423 |
| 4.00 | Providing and laying cement concrete 1:5:10(1Cement: 5Sand: 10Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge with in all leads and lifts . | 21.25 | cum | 7,550 ₹1,60,437.5 Lowest | 8,000 ₹1,70,000 | 8,500 ₹1,80,625 |
| 4.01 | Providing and laying cement concrete 1:3:6(I cement.
3 sand: 6 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form workin: foundation & plinth to the entire satisfaction of the engineer-in-Charge with in all leads and lifts . | 12.74 | cum | 8,600 ₹1,09,564 Lowest | 8,800 ₹1,12,112 | 8,900 ₹1,13,386 |
| 5.00 | Foundation and Plinth.(Detail of Cost for One cm) Providing and laying cement concrete work 1:1.5:3 (1cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : foundations, footings bases of columns and the like and mass concrete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.08 | cum | 10,500 ₹63,840 Lowest | 11,000 ₹66,880 | 11,500 ₹69,920 |
| 5.01 | Providing and laying cement concrete work 1:1.5:3(1cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in : Columns, pillars posts and struts upto floor two level. | 3.17 | cum | 12,000 ₹38,040 Lowest | 13,000 ₹41,210 | 13,500 ₹42,795 |
| 6.00 | Providing and laying cement concrete work 1:1.5:3(1 cement: 1.5 sand: 3 graded stone aggregate 20 mmnominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in Lintels, beams girders bressumers and cantilevers upto floor two level in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 3.72 | cum | 12,500 ₹46,500 Lowest | 13,500 ₹50,220 | 13,600 ₹50,592 |
| 7.00 | Providing and laying cement concrete work 1:1.5:3(1 cement: 1.5 sand: 3 graded stone aggregate 20 mmnominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in Lintels, beams girders bressumers and cantilevers upto floor two level in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.2 | cum | 12,500 ₹77,500 Lowest | 13,600 ₹84,320 | 13,700 ₹84,940 |
| 7.01 | Providing mild steel/tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level. | 1,341.33 | Kg | 101 ₹1,35,474.33 Lowest | 105 ₹1,40,839.65 | 110 ₹1,47,546.3 |
Tender Value
₹13.5 L
EMD Value
₹27,073
Closing Date
19 Sept 2026, 11:00 amClosed
EE JSD Rampur
JSD Rampur
CO pump house for LWSS PC hab. DPF Dilpa DPF Surugad, Dakshani Surugad Utri in GP Sarpara Tehsil Rampur Distt. Shimla HP JJM
2026_HPIPH_143074_1
7230-80 dated 08.09.2026
Open Tender
Civil Works
Item Rate
Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹27,073
22 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all classification of earth work such as pick work, jumper work. Blasting soft/hard rock or chiselling where blasting is prohibited and disposal of all excavated earth complete with in all leads and lifts & entire satisfaction of the Engineer-in-Charge.(Pick work 80% & Jumper work20%) | 104.35 | Cum | - | - |
| 2 | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | 8.84 | Cum | - | - |
| 3 | Excavation in foundations, trenches etc.. in earth work lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc.conslidating each deposited layer by ramming & watering & then disposing of all surplus excavatedearth as directed within a lead of 20 metres complete in all respect as per entire atisfaction of Engineer in Charge. | 91.42 | cum | - | - |
| 4 | Providing and laying cement concrete 1:5:10(1Cement: 5Sand: 10Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge with in all leads and lifts . | 21.25 | cum | - | - |
| 4.01 | Providing and laying cement concrete 1:3:6(I cement.
3 sand: 6 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form workin: foundation & plinth to the entire satisfaction of the engineer-in-Charge with in all leads and lifts . | 12.74 | cum | - | - |
| 5 | Foundation and Plinth.(Detail of Cost for One cm) Providing and laying cement concrete work 1:1.5:3 (1cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : foundations, footings bases of columns and the like and mass concrete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.08 | cum | - | - |
| 5.01 | Providing and laying cement concrete work 1:1.5:3(1cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in : Columns, pillars posts and struts upto floor two level. | 3.17 | cum | - | - |
| 6 | Providing and laying cement concrete work 1:1.5:3(1 cement: 1.5 sand: 3 graded stone aggregate 20 mmnominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in Lintels, beams girders bressumers and cantilevers upto floor two level in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 3.72 | cum | - | - |
| 7 | Providing and laying cement concrete work 1:1.5:3(1 cement: 1.5 sand: 3 graded stone aggregate 20 mmnominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in Lintels, beams girders bressumers and cantilevers upto floor two level in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.2 | cum | - | - |
| 7.01 | Providing mild steel/tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level. | 1,341.33 | Kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Form6.pdf
Tender Documents • 0.27 MB
F8.pdf
Tender Documents • 1.09 MB
Terms.pdf
Tender Documents • 0.05 MB
BOQ_212504.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .