General Manager, CRITL and OE, JUSNL
Arun Kumar, General Manager, CRITL/O.E, JUSNL
Repairing of Two Nos. 50 MVA Three Phase 132/33 kV Power Transformer of ECE make at 132/33 kV GSS Deoghar and 220/132/33 kV GSS Godda
2026_JSEB_117839_1
450/PR/JUSNL/2026-27
Open Tender
Electrical Works
Works
180 days
Deoghar and Godda
Please Refer the Tender Document
4 documents required · 4 mandatory
₹11,800
₹6.9 L
Ranchi
24 Sept 2026
24 Aug 2026
24 Sept 2026
24 Aug 2026
23 Sept 2026
24 Aug 2026
28 Aug 2026
Dragging of 120 Meters, Turning & Loading of the transformer and its accessories on Trailer & Transportation (including Transit Insurance) from Deoghar to firm's works and Unloading at Firm's works
Complete dismantling of the core & coll assembly, removal of top yoke Lamination, disconnection of all main leads and tapping leads, removal of all the windings, Dismantling of the total core lamination
Manufacturing of new HV, LV & Tap Windings for all the 3-phases using new copper and new insulation Material. Replacement of entire Insulation Material such as inter winding, winding to core and winding to frame.
Complete replacement of core to frame insulation, clamping of core and binding of core by resi-glass fiber bound tape, Assembly of windings over the core, re-fixing of top Yoke lamination and re- fixing of top frame with Yoke bands & Process in Vapour Phase Drying (VPD)/Vacuum Drying. Complete change of Gasket set and hardware.
New oil 25% considered as loss of oil due to dismantling and internal Inspections
Complete Overhauling of On load Tap Changer (OLTC)
Routine tests, Transformer as per standards, low voltage testing is to be done before dismantling and after re-assembly of transformer
Loading of the Transformer and its accessories and Equipment on the Trailer at the works & Transportation (i/c Transit insurance) to Deoghar 132/33kV Sub-Station, and Unloading and 120 Meters dragging, Turning placing of Transformer on Plinth at Site.
Installation and commissioning Testing of Power transformer and Commissioning of the Transformer at Sub Station Site
Sub Total
Add GST @ 18% on Sl. No 10
Total A (Sr.No 10+11)
Copper scrap of all winding
Sub Total
Add GST @ 18% on Sl. No 13
Sub Total
Grand Total (A-B) (12-16)
Say Rs.
In Words:
Note: Fill up the blue colour box
Schedule of Quantities and Prices for
Repairing of 50 MVA, 132/33 kV ECE make Power Transformer bearing Sr. No. 86912 at 220/132/33 kV GSS Godda
NIT No. 450 /PR/JUSNL/2026-27
Name of Bidder =>
Dragging of 120 Meters, Turning & Loading of the transformer and its accessories on Trailer & Transportation (including Transit Insurance) from Deoghar to firm's works and Unloading at Firm's works
Complete dismantling of the core & coll assembly, removal of top yoke Lamination, disconnection of all main leads and tapping leads, removal of all the windings, Dismantling of the total core lamination
Manufacturing of new HV, LV & Tap Windings for all the 3-phases using new copper and new insulation Material. Replacement of entire Insulation Material such as inter winding, winding to core and winding to frame.
Complete replacement of core to frame insulation, clamping of core and binding of core by resi-glass fiber bound tape, Assembly of windings over the core, re-fixing of top Yoke lamination and re- fixing of top frame with Yoke bands & Process in Vapour Phase Drying (VPD)/Vacuum Drying. Complete change of Gasket set and hardware.
Fresh transformer oil of standard quality as per JUSNL Standard
Valve 50/80, radiators valve MM
Testing charges of transformer
Transportation both sides (site to factory & factory to site) and loading/unloading complete site
Radiator Butterfly valve
MOLG (Main Oil Level Gauge)
PRV of main tank
Buchholz relay
Complete Overhauling of OLTC
Loading of the Transformer and its accessories and Equipment on the Trailer at the works & Transportation (i/c Transit insurance) to Godda 132/33kV Sub-Station, and Unloading and 120 Meters dragging, Turning placing of Transformer on Plinth at Site.
Installation and commissioning Testing of Power transformer and Commissioning of the Transformer at Sub Station Site
Total (A)
Copper scrap of all winding
Old oil
Valve & butterfly valve
Total (B)
Sub Total (A-B)
Grand Total
In Words :
Note: Fill up the blue colour box
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
TenderDocument450.pdf
Tender Documents • 1.51 MB
SOP-EMD-BOQ-Online-Tender-Fee.pdf
Additional Documents • 4.28 MB
PricePart450.xls
Additional Documents • 0.07 MB
Amendment450.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .