| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹13.9 L+₹5,265.11 (0.38%)Rejected-Finance | L2 | Rejected-Finance Highest | |
| 3 | L3₹14.0 L+₹9,537.93 (0.69%)Rejected-Finance | L3 | Rejected-Finance Highest |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
8 May 2024, 12:00 pmClosed
Superintending Engineer
(132/33 KV Campus) Gauriganj, Distt. Amethi.
Installation of new additional Transformer, Transformer capacity increasing, line related work and other work under the area of Electricity Distribution Division-Jagdishpur, Distt. Amethi in Business plan year 2024-25.
2024_MVVNL_923715_1
80/E.D.C.(G.)/2023-24
Open Tender
Electrical Works
Lump-sum
365 days
EDD-Jagdishpur, Distt. Amethi.
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE
₹14,000
10 May 2024
30 Apr 2024
8 May 2024
30 Apr 2024
8 May 2024
30 Apr 2024
Amount
Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.)
PCC/ST Pole
ACSR Weasel Conductor
33 KV XLPE Cable
33 KV Cable Jointing Kit
25/63/100 KVA Transformer
250/400 KVA Transformer
LT PVC Cable
11 KV Disc insulator with pin
33 KV/ 11 KV Pin Insulator with Pin
Top Channel
Earthing complete
Dropper Angle
S/S. Base angle
Fuse set 11 KV
AB Cable
T-Off Channel
11 KV X arm
Stay set complete
L.T. Aluminium Lug.
Other Line Materials
Dragging of STP/PCC Pole from dump store to pit site.
Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/ST pole support including digging of pit & fixing of all accessories and clamps as per RESSPO norms .(All civil material nuts & Bolts will be provided by the contractor).
Digging of pits up to the depth of 1650/2200 mm. as per site requirement.Fabrication & erection of double pole support on P.C.C./ST pole including digging of pit & fixing of all accessories and clamps (cost of clamps nuts & bolts will be born by the contractor ) as per RESPO norms.
Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. (All civil material nuts & Bolts will be provided by the contractor).
Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESSPO norms.
Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESSPO norm.
Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz. Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator
Spreading, Laying & Stringinging of AB Cable as per RESSPO norms.
Laying of 33 KV XLPE cable as per RESSPO norms.
Spreading, Laying & Stringinging of L.T. PVC Cable.
Fixing of 33 KV cable jointing kit as per RESSPO norms.
Demounting & Installation of 25 KVA, 63 KVA & 100 KVATransformer on constructed D/P making proper connections from 11 KV system and proper testing as well as commissioning of Transformer.
Construction of plinth for 250/400 KVA transformer of 2x2x1.2 mtr. with help of first class brick and masonry 1:4 cement & coarse sand. Filling the structure completely as per norm with RCC to 1:2:2 cement & stone grit with M.S. bar & M.S. for restling the transformer.
Repairing of old damaged plinth for 250/400 KVA transformer as per RESPO norms.
Installation of 250 /400KVA Transformer on newly constructed plinth making proper connections from 11 KV system and proper testing as well as commissioning of Transformer.
Construction of fencing for newely constructed Transformer plinth as per RESSPO norms.
Earthing of 11/0.4 KV T/F with sutable G.I. pipe and fixing sutable G.I. Strip including all material requaired to complete the work.
Installation of 11 KV fuse set as per RESPO norms.
Dismantling/Loading/unloading, carriage of Old Transformer from site store to store center Gauriganj/Sultanpur to dump store. (distance 0 to 40 Km.)
16 KVA Transformer
100 KVA Transformer
250 KVA T/F
Dismantling of old LT Line from site store to store center Gauriganj/Sultanpur to dump store. (distance 0 to 50 Km.)
Note: If any work which has been left over in BOQ and is necessary to complete the work, the same will be carried out by working agency free of cost.
M/S ABHAY CONTRACTOR
SHRI HANUMAN ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .