Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-Finance | ₹1.3 Cr | 1 | Accepted-Finance ok |
| 2 | 2₹1.3 Cr−₹5.4 L (4.08%)Accepted-Finance | ₹1.3 Cr−₹5.4 L (4.08%) | 2 | Accepted-Finance ok |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-as per MoM dated 06-12-2024 |
| 4 | Not Admitted-Fee/PreQual/Technical 51 PG ENCLAVE OPP SILVER OAK HOTEL PATEL NAGAR CITY CENTRE GWALIOR M P | GWALIOR | GWALIOR | MADHYA PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Others-as per MoM dated 06-12-2024 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-as per MoM dated 06-12-2024 |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
25 Nov 2024, 11:00 amClosed
SE PWD NH CIRCLE JODHPUR
SE PWD NH CIRCLE JODHPUR
Consultancy Services for preparation of Detailed Engineering report for Widening from two lane paved shoulder to four lane paved shoulder from Km 0.00 State boarder of Rajasthan AND Gujrat to 76.400 (Junction of NH62 in Sirohi Via Mandar Reodar AND A
2024_MoRTH_829302_1
NIT NO 02/2024-25 SE NH JODHPUR
Open Tender
Civil Works - Highways
Works
180 days
PALI
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹10,000
Yes
RPAOMoRTH JAIPUR
₹3.8 L
Yes
SE PWD NH CIRCLE JODHPUR
6 Jan 2025
8 Oct 2024
26 Nov 2024
8 Oct 2024
25 Nov 2024
8 Oct 2024
8 Oct 2024 - 4 Nov 2024
5 Nov 2024
Amount
Item Description
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Grand Total including Taxes & Duties (for all 3 phases)
** Total Cost Net of Goods & Service Tax shall be considered for financial evaluation Note: No escalation will be payable during the services Insurances shall not be allowed separately. These will be incidental to main items. Rates for all items shall be quoted in figures as well as in words.
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils,Qty. in mtr.
b)Boring in hard rock ,Qty. in mtr.
Sub Total
Note: * Quantities of borings shall be taken from Financial Proposal Form No. V. For financial evaluation, these quantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities.
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and Fixing boundary pillars and its installation , complete in all respect as per IRC:25,1967:Whereve the proposed alignment follows the exissting alignment, the boundary pillars shall be fixed at an interaval of 200m on either side of proposed right of way. Wherever there is a proposal of realignment of the existing Highway and/or construction of new bypass, consutant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval (lumsum)
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Note: The Consultant shall provide one Land Acquisition Expert along with allied team and supporting logistic as envisaged in Clause 5.1.5.1 of TOR for each 100 km stretches proposed for DPR preparation or part thereof (For example total length of package is 343 km, there will be four team).
Description of Work / Item(s)
Amount
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Description of Work / Item(s)
Amount
International Airfares (Fixed costs)
Inland Travel in Home Country (Lump Sum)
Description Lump Sum RATE Name Amount
Airlines
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Name Amount
Miscellaneous expenses
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
QuantitySurveyor/DocumentationExpert
LandAcquisitionExpert
LandAcquisition Surveyour
Utility Expert (for PHED)
Utility Expert (for Electrical)
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Computer Operator
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Innova crysta or equivalent (not more than 2 years old) (1 Nos. fo PWD Circle) provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.
Bolero or equivalent (not more than 2 years old) (1 Nos. fo PWD Division Udaipur) provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The office rent includes electicity and water charges, maintenance, cleaning, repairs, etc
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each) and 3(G)
LA & Clearances II Report
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
FP India Project Management Consultancy Services Pvt. Ltd. (BID ID -3124914)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
FP India Project Management Consultancy Services Pvt. Ltd. (BID ID -3124914)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3124793)
FP India Project Management Consultancy Services Pvt. Ltd. (BID ID -3124914)
Bidder Name
SA Infrastructure Consutants Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .