| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 CrAccepted-AOC | ₹25.3 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹25.6 CrRejected-AOC | ₹25.6 Cr | L2 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | RANJAN DUTTA L1 | NUMAL SAIKIA L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of drainage channel by mechanical means to the proper grade and slopes as required including disposing the excavated debris/soil to a safe distance of minimum 50 m distance, etc. complete as directed.
For lead up to 50 m and all lifts
Normal Soil | 3,93,322.8 | Cum | 126.72 ₹5.0 Cr | 130 ₹5.1 Cr |
| 2.00 | Earth work in excavation of drainage channel by mechanical means to the proper grade and slopes as required including disposing the excavated debris/soil to a safe distance of minimum 50 m distance, etc. complete as directed.
For lead up to 50 m and all lifts
Wet and Sticky Soil | 5,89,984.2 | Cum | 186.84 ₹11.0 Cr | 190 ₹11.2 Cr |
| 3.00 | Carriage of excavated muddy/slushy soil/garbage by truck of 10 Ton capacity and depositing the same in suitable dumping ground up-to an average lead of 2.50 Km including cost of P.O.L. and loading/unloading charges etc. complete as directed. | 2,94,992.1 | Cum | 100.56 ₹3.0 Cr | 100 ₹2.9 Cr |
| 4.00 | Supply of geo textile tube (Mega Container) with the minimum properties as mentioned below:
Polymer: PP of 400 GSM or above
Tube Circumference: 10m + 5%
Fill Port (diameter): 30 to 45 cm
Tensile Strength (MD): ≥100 kN/m
Tensile Strength (CD):≥100 kN/m
Elongation - MD:≤ 25%
AOS: ≤ 0.180 mm
Permittivity:≥ 0.40 S-1
Length: 25 m | 100 | Per Tube | 1,08,222.11 ₹1.1 Cr | 1,08,500 ₹1.1 Cr |
| 5.00 | Filling of geo-tubes (25m long and 10m circumference) with sand/silt of volume 176 cum by using mud pump not below the fill height of 1.60m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 250m, etc. including setting up of the tube laying platform, complete as directed. | 100 | Per Tube | 39,784.7 ₹39.8 L | 39,800 ₹39.8 L |
| 6.00 | Collection and supply of sand from approved quarry of specified grade for construction work free from debries and other foreign material etc. complete as directed and carriage upto site. | 17,600 | Cum | 1,423.46 ₹2.5 Cr | 1,450 ₹2.6 Cr |
| 7.00 | Compaction of locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 30 cm thick including ploughing or roughening or benching the seats, removing all debries, dressing as per design section and compaction with three wheel static roller of 80-100 KN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every 500m distance, etc. complete as directed. | 43,116.4 | Cum | 54.28 ₹23.4 L | 55 ₹23.7 L |
| 8.00 | Earth work in embankment by Mechanical means by truck carriage with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4 cm cube, dressing as per design section and compaction in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500 m distance, etc. complete as directed.
For initial lead up to 1 Km and for all lifts.
For every Km extra lead beyond initial lead of 1 Km & up to 10 Km.
(considering 2 Kms) | 25,516.4 | Cum | 358.52 ₹91.5 L | 360 ₹91.9 L |
| 9.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with
approved material.
V) In marshy soil
i) upto 3 m depth
B) Mechanical Means
(ii) With dewatering | 1,151.48 | Cum | 224.55 ₹2.6 L | 225 ₹2.6 L |
| 10.00 | Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
I. Without Plasticiser
A. P.C.C grade M 15 | 334.02 | Cum | 6,568.21 ₹21.9 L | 6,570 ₹21.9 L |
Tender Value
₹25.3 Cr
EMD Value
₹50.6 L
Closing Date
3 Nov 2025, 2:00 pmClosed
Chief Engineer, WRD, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Flood Management by Capacity Augmentation of Maijan Wetland Upstream of Dibrugarh Town, Package 2.
2025_DoWR_48009_1
DIBRUGARH/2025-26/NDMF/I
Open Tender
Civil Works
500 days
Dibrugarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹50.6 L
Yes
30 Jan 2026
13 Oct 2025
3 Nov 2025
13 Oct 2025
3 Nov 2025
22 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
maijan_bid_2.pdf
Tender Documents • 0.71 MB
BOQ_76443.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid