| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹18.7 L+₹44,928.26 (2.46%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹19.4 L+₹1.1 L (6.26%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.0 L
EMD Value
₹25,000
Closing Date
22 Sept 2026, 5:00 pmClosed
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Construction of Compound Wall of Masjid-e-Fahmida at Satya Nagar in Ward No. 34
2026_ORULB_140414_6
BMC-EE-Tender Cell-60/2026-27 dt. 03.09.2026
Open Tender
Civil Works - Others
Percentage
75 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹25,000
Yes
Office Chamber of EE(Central Tender Cell)
23 Sept 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
8 Sept 2026 - 11 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in Hard soil using one cum Bucket Hydraulic Excavator with all leads and lifts and transpotation of ecavated matiral by mechcanical means. and direction of Engg -in- charge | 128.7 | Cum | 209.95 | ₹27,020.56 |
| 2 | Supplying and filling of sand to the foundation bed of column pit, wall foundation and inside the filling with wellwatered and rammed etc and complete as per the direction of E.I.C. | 21.45 | Cum | 588.9 | ₹12,631.9 |
| 3 | P.C.C (1:4:8) using 40mm size black hard crusher broken metals with all cost, convency, royalty etc and complete as per direction of E.I.C. | 21.45 | Cum | 5,952.22 | ₹1,27,675.12 |
| 4 | R.C.C work of M25 Grade with 25mm size and down graded black hard granite crusher broken chips including cost, conveyance, royalty of all materials, cost of all labour T&P etc., Complete including centering shuttering and dismantled the centering material. | 16.3 | Cum | 8,030.64 | ₹1,30,915.49 |
| 5 | Supplying, fitting and placing uncoated H.Y.S.D bar reinforcement complete as per drawing and technical specification. | 16.3 | Qnlt | 9,402.87 | ₹1,53,285.59 |
| 6 | Brick masonary in fly ash brick in C.M (1:6) with all cost, convency, royalty etc., and complete as per direction of E.I.C. A. Foundation | 54.05 | Cum | 5,545.28 | ₹2,99,722.38 |
| 6.01 | Super Structure | 132.99 | Cum | 5,581.11 | ₹7,42,231.82 |
| 7 | 12mm thick plaster in CM (1:6) over brick masonary including all cost. | 702 | Sqm | 190.9 | ₹1,34,011.8 |
| 8 | 16mm thick plaster in CM (1:6) over brick masonary including all cost. | 702 | Sqm | 276.43 | ₹1,94,053.86 |
| 9 | Supplying all materials, labour, T&P and providing Cement Concrete (1:2:4) using 12mm to 20mm size CBHG chips etc. complete. | 5.36 | Cum | 7,924.09 | ₹42,492.93 |
stage.html
html • 0.02 MB
finance_608580.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
DTCN_60.pdf
Tender Documents • 0.91 MB
BOQ_608580.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .