| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | ₹14.5 L Quoted ₹17.3 L | L1 | Accepted-AOC AOW ISSUED |
| 2 | L2₹19.9 L+₹2.6 L (15.0%)Rejected-Finance | ₹19.9 L+₹2.6 L (15.0%) | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹24.4 L+₹7.1 L (41.1%)Rejected-Finance | ₹24.4 L+₹7.1 L (41.1%) | L3 | Rejected-Finance BEING L3 |
| 4 | L4₹28.4 L+₹11.1 L (64.1%)Rejected-Finance AT PO BARIHAPUR PS PARJANG DIST DHENKANAL PIN 759120 | DHENKANAL | ODISHA | 759120 | ₹28.4 L+₹11.1 L (64.1%) | L4 | Rejected-Finance BEING L4 |
| 5 | L5₹29.1 L+₹11.8 L (68.1%)Rejected-Finance AT HARICHANDANPUR PO BADATRIBID PS KANIHA DIST ANGUL PIN 759117 ODISHA | ANGUL | ANGUL | ODISHA | 759117 | ₹29.1 L+₹11.8 L (68.1%) | L5 | Rejected-Finance BEING L5 |
Tender Value
₹25.8 L
EMD Value
₹32,300
Closing Date
29 Apr 2024, 5:00 pmClosed
STAFF OFFICER CIVIL KANIHA AREA
STAFF OFFICER CIVIL KANIHA AREA MCL TALCHER ANGUL ODISHA 759102
Deepening of Pond of Rutubhuin under CSR works of Kaniha Area. Re Tender
2024_MCL_306661_1
MCL/GM(KA)/SO(C)/2024-25/57 DT. 16/04/24
Open Tender
Civil Works - Others
Item Rate
180 days
KANIHA OCP
AS PER NIT
3 documents required · 3 mandatory
₹32,300
26 Jul 2024
16 Apr 2024
30 Apr 2024
18 Apr 2024
29 Apr 2024
18 Apr 2024
18 Apr 2024 - 22 Apr 2024
Amount
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications )
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Brick work with Fly Ash Brick (230x125x75 mm size) bricks of class designation 10 in foundation and plinth in:Cement mortar 1:4(1cement:4 coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:1½:3 (1 Cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Lettering with black Japan paint of approved brand and manufacture
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:1½:3 (1 Cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
Brick work with Fly Ash Brick (230x125x75 mm size) bricks of class designation 10 in foundation and plinth in:Cement mortar 1:4(1cement:4 coarse sand)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
Colour washing such as green, blue or buff to give an even shade :New work (two or more coats) with a base coat of whiting
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. 600 mm dia RCC pipes.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
SOUBHAGYA KUMAR PRADHAN
PRABIN KUMAR BEHERA
DIPAK KUMAR SAHOO
Maa Hingula Enterprises
HIMANSU BHUSAN SAHOO
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .