| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Finance | -17.25% | ₹7.1 L | L1 | Admitted-Finance |
| 2 | L2₹7.3 L+₹19,443.27 (2.73%)Admitted-Finance | -14.99% | ₹7.3 L+₹19,443.27 (2.73%) | L2 | Admitted-Finance |
| 3 | L3₹8.6 L+₹1.5 L (20.8%)Admitted-Finance H NO 1298 VPO SEMAN 115 TEHSIL MEHAM DISTRICT ROHTAK 124112 | MEHAM | ROHTAK | HARYANA | 124112 | +0.00% | ₹8.6 L+₹1.5 L (20.8%) | L3 | Admitted-Finance |
Tender Value
₹8.6 L
EMD Value
₹17,200
Closing Date
9 Sept 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 2 Hissar
Annual Maintenance Estimate for Strom Water Drainage Scheme in Sector 14P-II and 33P , Hisar (2026-27)
2026_HBC_545026_1
202604998B2A 3EE6 47CA 93DD D25CC6B497AE260HSV
Open Tender
Civil Works
Works
120 days
Hisar
147/2026
2 documents required · 2 mandatory
₹500
Yes
₹17,200
Yes
15 Sept 2026
2 Sept 2026
10 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) | 88.21 | Sqm | 139 | ₹12,261.19 |
| 2 | [11.51]Smooth finishing of the exposed surface of R.C.C. work with 10 mm thick cement mortar 1:4 (1 Cement : 4 fine sand). | 72.17 | Sqm | 99 | ₹7,144.83 |
| 3 | [21.87.1.2]Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick lime concrete 16:24:100 (as per specified in item No.10.6) in foundations 1st class brick work laid in cement sand mortar 1:5, 40 mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12mm in thickness of 1:2 cement sand plaster and finished with floating coat of neat cement 1 mm thick left absolutely smooth polished and correct to templates including labour for fixing the C.I. road gully grating and frame including painting with coal tar (as Specified in item No. Item 21.48) complete to the requirement of the Engineer in-charge 1.2. Single road gully chamber - Size.-610 mmx457 mmx1105mm | 30 | Each | 4,085 | ₹1,22,550 |
| 4 | [21.90.10.2]Construction of rectangular standard brick masonry manhole chambers to standard drawings on S.W. pipe sewers or other circular pipe sewers up to the required depth in 1.5 cement sand mortar, lime concrete in bed and sides of pipe sewer and cement concrete 1:2:4 in benching, 12 mm thick water tight 1:2 cement sand plaster with a floating coat of neat cement and finished with 2 coats of sodium silicate on interior surface where required, reinforced cement concrete slab 180mm thick fixing 560 mm internal diameter C.I. manhole cover and frame weight not less than 2.5 quintal painted with 3 coats of black bitumen paint, fixing galvanised malleable iron steps embedded in 1:2 cement sand mortar complete. the rate covers the cost of M.S. steel for R.C.C. slab labour for fixing and carriage of C.I. manhole frame and cover and malleable iron steps from the stores of the Engineer-in-charge of the works to the site of works. The rate also include the cost of accurately planned and fitted centring, supports for all works as well as for all curves and special work, cleaning out their beds etc. sodium silicate shall be supplied free of cost at the stores of the Engineer-in-charge. 10.2. On 400 mm internal diameter pipe sewer - for 2.70 meters depth below ground level | 5 | Each | 22,543 | ₹1,12,715 |
| 5 | [21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | 50 | Each | 1,058 | ₹52,900 |
| 6 | [21.95.2]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 2. 400 mm | 175 | Metre | 1,438 | ₹2,51,650 |
| 7 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 968.75 | cum | 83 | ₹80,406.25 |
| 8 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 218.75 | cum | 138 | ₹30,187.5 |
| 9 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | 3.22 | cum | 4,464 | ₹14,374.08 |
| 10 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns | 39.8 | Sqm | 155 | ₹6,169 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_624581.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .