Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.6 L
EMD Value
₹7,600
Closing Date
23 Sept 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR DRDA MADURAI
DRDA, MADURAI-20
RCSIDS 2019-20 MADURAI DISTRICT VADIPATTI BLOCK PACKAGE NO 09
2020_RDTN_165063_1
d4/1140/2019/RCSIDS/vad09
Open Tender
Civil Works
Item Rate
180 days
Vadipatti
Refer Tender document
3 documents required · 3 mandatory
₹0
₹7,600
23 Sept 2020
27 May 2020
23 Sept 2020
27 May 2020
23 Sept 2020
29 May 2020
90 days
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc., complete with standard specification
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges f etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs etc., complete complying with standard specification
Reinforced Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works including curing and providing fixtures like fan clamp sin the RCC floor.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works
Fabrication and Supply of MILD STEEL DOOR
Steel door
Steel door
Towards the Labour charges for fixing in position of Steel Dorrs
Window
Towards the cost and supply of RCC Jolly of size 0.60 X 0.3 m including all charges etc., complete
Towards the Labour charges for fixing in position of supplied RCC Jolly
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Paving the floor with Anti skid tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly completion
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Plastic emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall )
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Providing Granolithic pattern floor finish with c.c 1:2:4 mix using 10 to 12mm ISS metal including cost & conveyance of all materials to site and all labour charges etc.,
Towards the cost and supply of EWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Towards the cost and supply of IWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Towards the cost and supply of Wash basin with view mirror including all charges etc., complete
Towards Supply of PVC tank with 500 litre capacity
Provision for Name board
Earth work excavation for foundation in all class of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc., complete with standard specification
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges f etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs etc., complete complying with standard specification
Reinforced Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works including curing and providing fixtures like fan clamp sin the RCC floor.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works
Fabrication and Supply of MILD STEEL DOOR
Steel door
Steel door
Towards the Labour charges for fixing in position of Steel Dorrs
Window
Towards the cost and supply of RCC Jolly of size 0.60 X 0.3 m including all charges etc., complete
Towards the Labour charges for fixing in position of supplied RCC Jolly
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Paving the floor with Anti skid tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly completion
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Plastic emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall )
Painting TWO coats of new iron works such as steel doors, windows, ventilators, window bars etc with best approved first quality of synthetic enamel pait of approved colour over the existing priming coats, etc complete complying with standard specification.
Providing Granolithic pattern floor finish with c.c 1:2:4 mix using 10 to 12mm ISS metal including cost & conveyance of all materials to site and all labour charges etc.,
Towards the cost and supply of EWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Towards the cost and supply of IWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Towards the cost and supply of Wash basin with view mirror including all charges etc., complete
Towards Supply of PVC tank with 500 litre capacity
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VEERABATHIRAN CHAKKARAVARTHI
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .