Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹9,840
Closing Date
29 Jun 2026, 6:55 pmDue tomorrow
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Development of Jinazgah at Nasrullapora A near Jamia Masjid
2026_RDPR_313303_15
NIT_14_REW_Budgam_2026_27
Open Tender
Civil Works
30 days
BUDGAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹9,840
23 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth,1 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 1 meters and lift upto 1.5 m | 5.52 | Cum | 479.3 | ₹2,645.74 | BI01010001010000000000000515BI0100001118 |
| 2 | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones | 12.48 | Cum | 1,105.35 | ₹13,794.77 | BI01010001010000000000000515BI0100001119 |
| 3 | P/L in position cement concrete of 1:4:8 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :4 F.A.(Natural/M-Sand) :8 C.A. ) with 20mm aggregate | 1.84 | Cum | 5,202.2 | ₹9,572.05 | BI01010001010000000000000515BI0100001120 |
| 4 | Providing and laying 60mm thick factory made cement concreteinterlocking paver block of M-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shapelaid in required colour and pattern over and including 50mm thickcompacted bed of fine sand, filling the joints with coarse sand etc. all
complete as per direction of Engineer-in-charge | 33.83 | Sqm | 795 | ₹26,894.85 | BI01010001010000000000000515BI0100001121 |
| 5 | 50 mm thick cement concrete coping in 1:2:4 mix | 4.83 | Sqm | 562 | ₹2,714.46 | BI01010001010000000000000515BI0100001122 |
| 6 | P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 17.67 | Cum | 5,733.6 | ₹1,01,312.71 | BI01010001010000000000000515BI0100001123 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 96.65 | Sqm | 286.35 | ₹27,675.73 | BI01010001010000000000000515BI0100001124 |
| 8 | Carriage of Stone aggregate for 20 kmts | 17.73 | Cum | 409.94 | ₹7,268.24 | BI01010001010000000000000515BI0100001125 |
| 9 | Carriage of Sand for 10 kmts | 8.87 | Cum | 279.04 | ₹2,475.08 | BI01010001010000000000000515BI0100001126 |
| 10 | Add provisions for signboard, Photographes ,carriage of cement ,steel ,tilesand other unforseen items. | 1 | job | 2,439.37 | ₹2,439.37 | BI01010001010000000000000515BI0100001127 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1013919.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid