Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.6 LAccepted-Finance 02 POST NAYABAS TEHSIL NEEMKATHANA | SIKAR | RAJASTHAN | 331024 | ₹26.6 L | 1 | Accepted-Finance ok |
| 2 | 2₹27.5 L+₹91,746 (3.45%)Accepted-Finance | ₹27.5 L+₹91,746 (3.45%) | 2 | Accepted-Finance ok |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹25.0 L
EMD Value
₹49,998
Closing Date
11 May 2026, 5:00 pmClosed
EO
NAGAR PALIKA RAWATSAR
Construction of Box culvert Rampura Road Semnala Ward No 25
2026_DLB_554779_1
DLB2627WSOB02947
Open Tender
Civil Works
Percentage
60 days
RAWATSAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MDRISL,EXECUTIVE OFFICER
₹49,998
Yes
22 May 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer .
Dismantling Brick / Tile work. In cement mortar | 34.67 | Cum | 394.5 | ₹13,675.58 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer .Cement Concrete Grade M-15 and above and PCC blocks | 10.68 | Cum | 678 | ₹7,237.65 |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking By Mechanical means.lead upto 4 km.Stone, boulders, gravelly material | 45.34 | Cum | 218.67 | ₹9,914.63 |
| 4 | Pumping out water caused by springs, tidal or river seepage, broken water main or drains and the like with pumping set of following H.P. including P.O.L. / Power consumption etc. Complete. 20 to 30 H.P. | 160 | hour | 244 | ₹39,040 |
| 5 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 260 | Cum | 229.5 | ₹59,670 |
| 6 | Add extra for overall depth of excavation above 1.5 m and upto 3.0 m over item no 4.10.1.1 | 16 | Cum | 16.1 | ₹257.6 |
| 7 | Add extra for overall depth of excavation above 3.0 m and upto 4.5 m over item no 4.10.1.1 | 396 | Cum | 36.7 | ₹14,533.2 |
| 8 | Add extra over item no 4.10.1, 4.10.2, 4.10.3 and 4.10.4 in RUIDP SOR for excavation in saturated soil, silt and sludge where pumping or bailing out of water is required including shoring strutting where required and dewatering, where width is upto 6 metre.Excavation depth from ground level 0.0 to 9.0 m.Excavation from Encountered depth of water table 1.5 to 3.0 m | 532 | Cum | 91.8 | ₹48,837.6 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 120 | Cum | 4,575 | ₹5,49,000 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 59.2 | Cum | 4,575 | ₹2,70,840 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_988069.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .