| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.3 LAccepted-AOC | ₹88.3 L | L1 | Accepted-AOC Work Allotted |
| 2 | Rejected-Technical | - | - | Rejected-Technical documents not found in order |
| Sl No | Description | Qty | Unit | SHAKTI ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00 | Cofferdam (Closing Bund)
Construction of whole bamboo single pallasiding with matured bhaluka bamboo post 7.5 cm to 10 cm dia 5 cm apart 1.5 M to 1.8 M above ground and 1 M to 1.2 M below ground with jati bamboo struts placed 1.2 M to 1.5 M apart tied RM Rs. 833.35 with galvanized wire with 16 G to 18 G complete with 3 rows of horizontal half jati bamboo kamies, complete as directed. | 20 | m | 1,058.72 ₹21,174.4 Lowest |
| 2.00 | Supplying and laying cement bags filled with sand , earth (as locally available) including stitching the mouth ,laying, fixing in position as directed complete with supply of bags sutlies etc. all complete. | 1,655 | bags | 55.92 ₹92,547.6 Lowest |
| 3.00 | Labour charge for filling the cement bag with sand /earth (as locally available) including the same laying in position etc. all complete as directed.(Empty cement bag to be supplied by the department) | 1,655 | bags | 31.38 ₹51,933.9 Lowest |
| 4.00 | Construction of RCC Aqueduct Aqueduct at M2 at Chainage 5290.00m
Earthwork in excavation in diversion / feeder channel to the design section and
grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps
etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
In hard Soil
(ii) Soil mixed with gravel or boulders upto 30 cm size | 269.47 | m3 | 515.97 ₹1,39,038.44 Lowest |
| 5.00 | Cost of dewatering involved during earthwork in excavation of foundation trenches of canal structures(by pump) in soil mixed with silt and sand etc. Dewatering by using 1 no. 10 HP and 1 no. 5 HP water pump. | 165.6 | m3 | 308.07 ₹51,016.39 Lowest |
| 6.00 | CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately) | 3.93 | m3 | 6,960.97 ₹27,356.61 Lowest |
| 7.00 | CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately) | 25.9 | m3 | 10,181.15 ₹2,63,691.79 Lowest |
| 8.00 | RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 67.31 | m3 | 11,686.07 ₹7,86,589.37 Lowest |
| 9.00 | Supplying of quick setting concrete admixture of specified brand including loading and unloading, carriage to the work site, complete as directed. | 91 | litre | 276.7 ₹25,179.7 Lowest |
| 10.00 | Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. | 41.68 | qtl. | 12,283.07 ₹5,11,958.36 Lowest |
Tender Value
₹98.1 L
EMD Value
₹2.0 L
Closing Date
15 Jul 2025, 12:00 pmClosed
Addl. Chief Engineer cum CHD Irrigation, BTC Kokra
o/o the Addl. Chief Engineer cum CHD Irrigation, BTC Kokrajhar
Construction of RCC Aqueduct at D2 Canal at Ch. 5290.0m_Construction of Canal Syphone at M10D1_Construction of additional Culverts (10 m Long) at chainage 2000 m of D1 and at Chainage 17840 m of D2,at ERM Sukla Irrigion Project under PMKSY-AIBP
2025_BoTC_45216_2
ACE/CHDI/10/2025/08 dated 26/06/2025
Open Tender
Civil Works
Works
365 days
Suklai area
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹2.0 L
Yes
22 Aug 2025
27 Jun 2025
16 Jul 2025
27 Jun 2025
15 Jul 2025
27 Jun 2025
Amount
Cofferdam (Closing Bund) Construction of whole bamboo single pallasiding with matured bhaluka bamboo post 7.5 cm to 10 cm dia 5 cm apart 1.5 M to 1.8 M above ground and 1 M to 1.2 M below ground with jati bamboo struts placed 1.2 M to 1.5 M apart tied RM Rs. 833.35 with galvanized wire with 16 G to 18 G complete with 3 rows of horizontal half jati bamboo kamies, complete as directed.
Supplying and laying cement bags filled with sand , earth (as locally available) including stitching the mouth ,laying, fixing in position as directed complete with supply of bags sutlies etc. all complete.
Labour charge for filling the cement bag with sand /earth (as locally available) including the same laying in position etc. all complete as directed.(Empty cement bag to be supplied by the department)
Construction of RCC Aqueduct Aqueduct at M2 at Chainage 5290.00m Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Cost of dewatering involved during earthwork in excavation of foundation trenches of canal structures(by pump) in soil mixed with silt and sand etc. Dewatering by using 1 no. 10 HP and 1 no. 5 HP water pump.
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying of quick setting concrete admixture of specified brand including loading and unloading, carriage to the work site, complete as directed.
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc. (ii) With Contractor's Profit & GST
Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Construction of Canal Syphone at M10D1 Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directed.(ii) In RCC slab culvert.
Earthwork in excavation in diversion / feeder channel to the design section andgrade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Cost of dewatering involved during earthwork in excavation of foundation trenches of canal structures(by pump) in soil mixed with silt and sand etc. Dewatering by using 1 no. 10 HP and 1 no. 5 HP water pump.
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying of quick setting concrete admixture of specified brand including loading and unloading, carriage to the work site, complete as directed.
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc. (ii) With Contractor's Profit & GST
Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
10.0 M SPAN Slab Culvert at D1 at Ch 2000 Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directed.(ii) In RCC slab culvert.
:-Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified A. In ordinary soil
Cement concrete work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. whe
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. c
Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed.
Machine mixing charge of cement concrete / reinforced cement concrete with different types of concrete mixture machine of 10 / 7 CuFt capacity.
Vibrating in CC/RCC work with vibrator including local carriage of vibrator etc. complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Shuttering (Beam) with Prop.
12 mm cement plastering including clearing surface and curing, complete as directed (ii) In proportion 1:4
Earth work in back filling of structure obtained from outside borrow pits filling in 15cm layers, ramming, dressing, watering including paying compensation of land if any (with lead upto 30.0 m and lift 1.50m).
Earthwork in filling in Marginal bund / Guide bank /Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming,watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
10.0 M SPAN Slab Culvert at D2 at Chainge 17840 m Dismantling the existing culvert including clearing and removing the dismantled materials to a safe place and stacking the serviceable material at a suitable place as directed.(ii) In RCC slab culvert.
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified A. In ordinary soil
Cement concrete work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. whe
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. c
Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed.
Machine mixing charge of cement concrete / reinforced cement concrete with different types of concrete mixture machine of 10 / 7 CuFt capacity.
Vibrating in CC/RCC work with vibrator including local carriage of vibrator etc. complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Shuttering (Beam) with Prop.
12 mm cement plastering including clearing surface and curing, complete as directed (ii) In proportion 1:4
Earth work in back filling of structure obtained from outside borrow pits filling in 15cm layers, ramming, dressing, watering including paying compensation of land if any (with lead upto 30.0 m and lift 1.50m).
Earthwork in filling in Marginal bund / Guide bank /Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming,watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .