Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.6 LAdmitted-Finance AZAMGARH CIRCLE EE BALLIA | -15.00% | ₹53.6 L | L1 | Admitted-Finance |
| 2 | L1₹53.6 LAdmitted-Finance 0 JAGDISHPUR SOHOULI MARTINGANJ TEH MARTINGANJ AZAMGARH UTTAR PRADESH 276301 | AZAMGARH | UTTAR PRADESH | 276301 | -15.00% | ₹53.6 L | L1 | Admitted-Finance |
| 3 | L1₹53.6 LAdmitted-Finance B 304 RAJAJIPURAM AMBA PALACE AWAS VIKAS COLONY LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | -15.00% | ₹53.6 L | L1 | Admitted-Finance |
| 4 | L1₹53.6 LAdmitted-Finance | -15.00% | ₹53.6 L | L1 | Admitted-Finance |
| 5 | L1₹53.6 LAdmitted-Finance | -15.00% | ₹53.6 L | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5.2 L
Closing Date
7 Jul 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction of a CC road in Basaha (under Shaheed Bhagat Singh Ward No. 2), stretching from Verma Flour Mill near the Central Unani Institute Road to the vicinity of Mr. Sudhir Verma house.
2026_DOLBU_1163349_1
57(7)/CE/2026-27/09
Open Tender
Civil Works
Fixed-rate
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,436
Lucknow Municipal Corporation
₹5.2 L
29 Aug 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Cutting in ordinary soil Including etc. all complete. | 2,142.9 | Sqm | 102.57 | ₹2,19,797.25 |
| 2 | P/L C.C. In 1:5:10 cement, C. Sand, graded stone grit 40 mm etc.all complete. | 64.19 | cum. | 4,889.51 | ₹3,13,857.65 |
| 3 | 150 class brick work in foundation in 1:4 cement C.Sand morter etc all complete. | 157.04 | cum | 6,715 | ₹10,54,523.6 |
| 4 | 12 mm. thick plaster in 1:4 cement and course sand mortar etc.all complete.(271.46) | 1,148.24 | Sqm | 271.46 | ₹3,11,701.23 |
| 5 | Providing and Laying G.S.B. as well gradede uniform layer etc. all complete. | 257.15 | cum. | 3,866.86 | ₹9,94,363.05 |
| 6 | P/L Sepration Membrance of impermeable plastic sheeting 125 micron thick etc all complete. | 2,142.9 | Sqm. | 15 | ₹32,143.5 |
| 7 | P/LC.C. 1:2:4 Cement, C.Sand,Stone Grit etc.all complete. (7878.50x0.78995=6223.64) | 21.71 | cum. | 6,223.64 | ₹1,35,115.22 |
| 8 | P/L C.C. 1:2:4 Cement, C.Sand,Stone Grit (M-20 grade) etc.all complete. (9212.60x0.78995=7277.49) | 321.44 | cum. | 7,277.49 | ₹23,39,276.39 |
| 9 | Trimixing for C.C. floore etc all complete. | 2,142.9 | Sqm. | 89.54 | ₹1,91,875.27 |
| 10 | Centering and Shuttering including Strutting,propping etc and removal of form work. (927.25x0.78995 =732.48) | 14.58 | Sqm. | 732.48 | ₹10,679.56 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 9.95 MB
BOQ_2180938.xls
BOQ • 3.18 MB
Dateextension.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .