Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹22.5 L+₹1.1 L (5.20%)Rejected-AOC H NO 116 GOVIND VIHAR COLONY JANTA ROAD SAHARANPUR | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | yogesh Kumar L2 | HEERAA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Dismentaling Brick Work In cement mortar i/c stackng of material with 60m. | 84 | Cum | 620 ₹52,080 | 587 ₹49,308 Lowest |
| 2.00 | Dismantling R.B. Work with disposal of refuse with in 60 m. | 37 | Cum | 748 ₹27,676 | 708 ₹26,196 Lowest |
| 3.00 | Dismantling of C.C. Floor i/c base concrete and including stacking of Dismantled material with in 60 m distance. | 96 | sqm | 34 ₹3,264 | 32 ₹3,072 Lowest |
| 4.00 | E/W in foundation in dry ordinary soil including lift upto1.5 meter And lead up to 30 m and including back filling watering and ramming of exacavated earth into the spce between the structure as Directed by the Engineer-in- Charge | 13.2 | Cum | 120 ₹1,584 | 114 ₹1,504.8 Lowest |
| 5.00 | Providing and laying C.C. 1:3:6 with cement, Coarse sand and stone grit (20-40 mm size) including cost of all material, labour and T&P etc.complete. | 1.7 | Cum | 5,869 ₹9,977.3 | 5,544 ₹9,424.8 Lowest |
| 6.00 | Brick work in Class-150 in 1:4 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 84 | Cum | 5,536 ₹4,65,024 | 5,230 ₹4,39,320 Lowest |
| 7.00 | RCC Work in 1:2:4 cement, coarse sand,stone grit 10- 20 mm size including Labour, T&P and curing etc. | 22 | Cum | 7,168 ₹1,57,696 | 6,770 ₹1,48,940 Lowest |
| 8.00 | Dry Brick work in Class 150 including supply of all material Labour, T&P etc. | 2.8 | Cum | 4,098 ₹11,474.4 | 3,871 ₹10,838.8 Lowest |
| 9.00 | Brick work in Class-150 in 115mm Thick Wall in 1:4 cement and coarse sand mortar including cost of all material, labour and T&P etc.complete for proper completion of work. | 17 | Cum | 5,538 ₹94,146 | 5,230 ₹88,910 Lowest |
| 10.00 | Centering and shuttering for C C Work including supply of all material Labour, T&P etc (Complete language for all heights.) | 6.6 | sqm | 690 ₹4,554 | 651 ₹4,296.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
6 Jun 2026, 5:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT04
2026_UPIDC_1148964_11
02/Ee/2026-27
Open Tender
Civil Works
Piece-work
90 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹46,000
Yes
12 Aug 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling Brick Work In cement mortar i/c stackng of material with 60m. | 84 | Cum | - | - |
| 2 | Dismantling R.B. Work with disposal of refuse with in 60 m. | 37 | Cum | - | - |
| 3 | Dismantling of C.C. Floor i/c base concrete and including stacking of Dismantled material with in 60 m distance. | 96 | sqm | - | - |
| 4 | E/W in foundation in dry ordinary soil including lift upto1.5 meter And lead up to 30 m and including back filling watering and ramming of exacavated earth into the spce between the structure as Directed by the Engineer-in- Charge | 13.2 | Cum | - | - |
| 5 | Providing and laying C.C. 1:3:6 with cement, Coarse sand and stone grit (20-40 mm size) including cost of all material, labour and T&P etc.complete. | 1.7 | Cum | - | - |
| 6 | Brick work in Class-150 in 1:4 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 84 | Cum | - | - |
| 7 | RCC Work in 1:2:4 cement, coarse sand,stone grit 10- 20 mm size including Labour, T&P and curing etc. | 22 | Cum | - | - |
| 8 | Dry Brick work in Class 150 including supply of all material Labour, T&P etc. | 2.8 | Cum | - | - |
| 9 | Brick work in Class-150 in 115mm Thick Wall in 1:4 cement and coarse sand mortar including cost of all material, labour and T&P etc.complete for proper completion of work. | 17 | Cum | - | - |
| 10 | Centering and shuttering for C C Work including supply of all material Labour, T&P etc (Complete language for all heights.) | 6.6 | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.89 MB
BOQ_2166110.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .