| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.6 LAccepted-Finance | L1 | Accepted-Finance accepted | |
| 2 | L2₹40.7 L+₹3.2 L (8.40%)Accepted-Finance | L2 | Accepted-Finance accepted |
| Sl No | Description | Qty | Unit | S.MATHURAM CONTRACTOR L1 | SRI TIRUMALA ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for removal of the local Pressure/Temperature Gauges and refixing them after calibration in Boiler, Turbine & Generator areas. | 400 | Nos. | 551 ₹2,60,072 Lowest | 575 ₹2,71,400 |
| 2.00 | Charges for removal of Pressure/Temperature Transmitters including disconnecting the control cables, removal of clamps & manifold and refixing them after calibration in Boiler, Turbine & Generator areas. | 600 | Nos. | 551 ₹3,90,108 Lowest | 575 ₹4,07,100 |
| 3.00 | Charges for dismantling, cleaning, replacement of gaskets(280x280mm) and re-fitting of level switch | 40 | Nos. | 2,687 ₹1,26,826.4 Lowest | 2,800 ₹1,32,160 |
| 4.00 | Charges for removing and refitting of accessories in Pneumatic Control Valves & Dampers such as I/P Convertors, Air Regulators, Air Lock Relays, Positioner and Position Feedback Transmitters sending to Lab for testing and receiving the tested instruments from Lab. | 24 | Nos. | 2,485 ₹70,375.2 Lowest | 2,600 ₹73,632 |
| 5.00 | Charges for Cutting and Welding of Take-off Catch Point in Mills, Flue Gas, Primary and Secondary Air Path. | 80 | Nos. | 883 ₹83,355.2 Lowest | 1,000 ₹94,400 |
| 6.00 | Charges for 3 Nos. of Single Point Cutting and Welding of Pipe Size 1/2" Impulse Lines of Mill, Flue Gas, Primary And Secondary Air Path including cost of Gas, Welding Electrodes & Consumables such as Cotton Waste, Hacksaw Blade, etc. | 100 | Nos. | 589 ₹69,502 Lowest | 650 ₹76,700 |
| 7.00 | Charges for Flushing of Impulse Lines of all Types of Transmitters in Boiler & Turbine area. | 1,300 | Nos. | 1,168 ₹17,91,712 Lowest | 1,300 ₹19,94,200 |
| 8.00 | Charges for Material and Tool Handling Disassembling and Reassembling Works in the Calibrating of Control Actuators. | 140 | Nos. | 1,168 ₹1,92,953.6 Lowest | 1,300 ₹2,14,760 |
| 9.00 | All types of Panel Cleaning includes DCS, UPS, Power Packs, Power Supply Panel, etc., Removal of Modules, Cleaning of Modules and Refixing the Modules. | 100 | Times | 2,504 ₹2,95,472 Lowest | 2,700 ₹3,18,600 |
| 10.00 | Releasing, Transporting, Overhauling, Checking, Refixing and Conducting Functional test on 4 nos. Burner Tilt Power Cylinders | 4 | Nos. | 12,797 ₹60,401.84 Lowest | 13,000 ₹61,360 |
Tender Value
Refer Docs
EMD Value
₹32,400
Closing Date
11 Sept 2026, 2:00 pmClosed
SE/ES/NCTPS-I
SE/ES, NCTPS-I, CH-120.
NCTPS I ES Circle C I Division Sub Division II Carrying out Maintenance activities of C I Equipments in Unit II BOP System and allied areas for a period of 360 Days during the year 2026 27
2026_EB_699541_1
CE/NCTPS-I/SE/ES/WC-38/2026-27
Open Tender
Power/Energy Projects/Products
Works
360 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹32,400
Yes
28 Sept 2026
29 Aug 2026
15 Sept 2026
29 Aug 2026
11 Sept 2026
29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for removal of the local Pressure/Temperature Gauges and refixing them after calibration in Boiler, Turbine & Generator areas. | 400 | Nos. | 500.66 | ₹2,00,264 |
| 2 | Charges for removal of Pressure/Temperature Transmitters including disconnecting the control cables, removal of clamps & manifold and refixing them after calibration in Boiler, Turbine & Generator areas. | 600 | Nos. | 500.66 | ₹3,00,396 |
| 3 | Charges for dismantling, cleaning, replacement of gaskets(280x280mm) and re-fitting of level switch | 40 | Nos. | 2,443.1 | ₹97,724 |
| 4 | Charges for removing and refitting of accessories in Pneumatic Control Valves & Dampers such as I/P Convertors, Air Regulators, Air Lock Relays, Positioner and Position Feedback Transmitters sending to Lab for testing and receiving the tested instruments from Lab. | 24 | Nos. | 2,259.4 | ₹54,225.6 |
| 5 | Charges for Cutting and Welding of Take-off Catch Point in Mills, Flue Gas, Primary and Secondary Air Path. | 80 | Nos. | 803 | ₹64,240 |
| 6 | Charges for 3 Nos. of Single Point Cutting and Welding of Pipe Size 1/2" Impulse Lines of Mill, Flue Gas, Primary And Secondary Air Path including cost of Gas, Welding Electrodes & Consumables such as Cotton Waste, Hacksaw Blade, etc. | 100 | Nos. | 535.33 | ₹53,533 |
| 7 | Charges for Flushing of Impulse Lines of all Types of Transmitters in Boiler & Turbine area. | 1,300 | Nos. | 1,061.5 | ₹13,79,950 |
| 8 | Charges for Material and Tool Handling Disassembling and Reassembling Works in the Calibrating of Control Actuators. | 140 | Nos. | 1,061.5 | ₹1,48,610 |
| 9 | All types of Panel Cleaning includes DCS, UPS, Power Packs, Power Supply Panel, etc., Removal of Modules, Cleaning of Modules and Refixing the Modules. | 100 | Times | 2,275.9 | ₹2,27,590 |
| 10 | Releasing, Transporting, Overhauling, Checking, Refixing and Conducting Functional test on 4 nos. Burner Tilt Power Cylinders | 4 | Nos. | 11,633.6 | ₹46,534.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_840942.xls
BOQ • 0.35 MB
corrigendum.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .