| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC | ₹7.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.3 LRejected-AOC | ₹7.3 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M.Gunasekaran L2 | K.Saravanakumar L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all classes of soil with an initial lead and lift of 10 m & 2 m including Cost of labour and conveyance as per Standard Specification SS 20 B | 13.94 | cum | 203 ₹2,829.82 | 197 ₹2,746.18 |
| 1.02 | Cement Concrete 1:4:8 Mix by using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete comply | 4.65 | cum | 5,259 ₹24,454.35 | 5,254 ₹24,431.10 |
| 1.03 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild stee | 82.8 | cum | 395 ₹32,706 | 390 ₹32,292 |
| 1.04 | Cement Concrete 1:3:6 (One cement Three sand and Six hard brocken stone) using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete co | 9.52 | cum | 6,012 ₹57,234.24 | 6,006 ₹57,177.12 |
| 1.05 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materils to site including all labour charges for filling etc. complete | 52.5 | cum | 297 ₹15,592.50 | 292 ₹15,330 |
| 1.06 | Construction of granular sub base by jproviding well graded materaial (25 mm to 4.75 mm IRC HBG metal @65%, 4.75 to 2.36mm IRC HBG metal @ 20 % & 2.36 mm below IRC HBG metal @ 15% ) | 52.5 | cum | 2,390 ₹1.3 L | 2,384 ₹1.3 L |
| 1.07 | Supplying and laying inder blicking blick of 60mm thick required shap in cement morter 1:1:2 using 10-12mm sizw HBG stone jelly including cost of centering shuttering laying vibrating ( with Mechnical vibrating ) finishing curing land. | 525 | sqm | 689 ₹3.6 L | 683 ₹3.6 L |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST | 1,11,603.04 ₹1.1 L | 1,10,828.05 ₹1.1 L |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
23 Jan 2026, 3:00 pmClosed
Block Development Office BP
Andipatti
Construction of Drainage in Muthusangilipatti village at Shunmugasundrapuram Panchayat under PUGF 2025-2026
2026_RDTN_644736_1
USS PUGF 2025-2026 23.01.2026
Open Tender
Civil Works - Others
Andipatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,500
Yes
31 Jan 2026
20 Jan 2026
23 Jan 2026
20 Jan 2026
23 Jan 2026
20 Jan 2026
Earth work excavation in all classes of soil with an initial lead and lift of 10 m & 2 m including Cost of labour and conveyance as per Standard Specification SS 20 B
Cement Concrete 1:4:8 Mix by using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete comply
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with all cross bracings using mild steel sheets of size 90 cm. x 60 cm. and 10 gauge stiffened, welded with mild stee
Cement Concrete 1:3:6 (One cement Three sand and Six hard brocken stone) using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete co
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materils to site including all labour charges for filling etc. complete
Construction of granular sub base by jproviding well graded materaial (25 mm to 4.75 mm IRC HBG metal @65%, 4.75 to 2.36mm IRC HBG metal @ 20 % & 2.36 mm below IRC HBG metal @ 15% )
Supplying and laying inder blicking blick of 60mm thick required shap in cement morter 1:1:2 using 10-12mm sizw HBG stone jelly including cost of centering shuttering laying vibrating ( with Mechnical vibrating ) finishing curing land.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_772616.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid