Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71,502.10Accepted-AOC KEDLA 03 NO MORE RAMGARH JHARKHAND 825325 | RAMGARH | RAMGARH | JHARKHAND | 825325 | L1 | Accepted-AOC L1 | |
| 2 | L2₹82,517.40+₹11,015.30 (15.4%)Rejected-AOC AT PO LAIYO DIST RAMGARH JHARKHAND | LAIYO | RAMGARH | JHARKHAND | 825325 | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.1 L+₹34,450.10 (48.2%)Rejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
Closing Date
8 Mar 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Engineer (Excv)Jharkhand OCP
Project Engineer (Excv)Jharkhand OCP, PO-Kedla, Dist- Ramgarh, Pin- 825325
Complete overhauling of Engine its foundation and calibration of fuel pump of ACE Crane 12 Te. Crane of Jharkhand OCP.
2023_CCL_273534_1
PE(X)/JOCP/NIT/22-23/109 Dated- 02.03.2023
Open Tender
Excavation Department Work
Item Rate
4 days
Jharkhand OCP
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
11 Mar 2023
2 Mar 2023
9 Mar 2023
2 Mar 2023
8 Mar 2023
2 Mar 2023
2 Mar 2023 - 7 Mar 2023
Amount
Changing of piston with pin and lock.
Changing of liners.
Changing of main began bearing (010 o/s)
Changing of CR bush and thrust washer.
Changing of head valve.
Replacement of valve guide.
Replacement of piston rings.
Changing of overhauling gasket.
Changing of rocker arm and bush.
Replacement of connecting rod bolt.
Replacement of engine chain and timing seal.
Changing of filter kit.
Changing of clutch plate.
Changing of pressure plate kit.
Supply of air compressor full kit.
Changing and fitting of cam rod.
Head machining and testing charges.
Machining charges, alignment of engine, fitting of sleeves and crank grinding work
Calibration of fuel pump.
Skilled - 01 person X 04 days.
Helper - 02 person X 04 days.
Total impact of GST for the purpose of CTC
M/S S. Z. Brothers & Company
HIRAMAN MAHTO
stage.html
html • 0.04 MB
techsummary_283048.pdf
PDF • 0.25 MB
finsummary_283048.pdf
PDF • 0.25 MB
workorder.pdf
PDF • 0.30 MB
finance_283048.pdf
PDF • 0.25 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .