| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical technically fit |
| 2 | Accepted-Technical | Accepted-Technical technically fit |
Tender Value
₹2.5 L
EMD Value
₹5,080
Closing Date
18 Sept 2026, 2:00 pmClosed
Executive Engineer
office Executive Engineer Saryu Nahar Khand-3, Balrampur
Construction work of total 06 No. outlets on Sohna Minor under Utraula Pum Canal system.
2026_UPIDC_1184520_3
02/E.E./2026-27
Open Tender
Civil Works - Canal
Item Rate
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹5,080
Yes
6 Oct 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction work of total 06 No. outlets on Sohna Minor under Utraula Pump Canal system. | |||||
| 1.01 | Earth work in excavation in foundation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-charge and as per I.D. specification. | 44.67 | Cum | - | - |
| 1.02 | Providing and laying in proper position Plain Cement Concrete in 1:3:6 (1 cement: 3 Hamirpur coarse sand of FM not less then 2.0: 6 kabrai graded stone aggregate 20 to 40 mm size) including cost of all material, labour, T&p etc for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specification | 8.22 | Cum | - | - |
| 1.03 | Providing and laying in proper position reinforced Cement Concrete in 1:1.5:3 (1 cement: 1.5 Hamirpur coarse sand of FM not less then 2.0 : 3 kabrai graded stone aggregate 10 to 20 mm size) including cost of all material, labour, T&p etc for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specification | 5.18 | Cum | - | - |
| 1.04 | Providing and laying Steel in Reinforcement including cost of steel carriage, bending, cutting placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge and per drawing and I.D. specification. | 0.18 | MT | - | - |
| 1.05 | Centering and shuttering for P.C.C and R.C.C. work including cost of all materials, labour and T&P etc. with all leads and lifts/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specification. | 70.12 | Sqm | - | - |
| 1.06 | Supply and fixing HDPE Kulawa Pipe 160mm dia as per letest IS specification PE-100: 6kg/Sqcm. including labour, T&P etc. required for proper completion of work and as directed by Engineer-in-Charge as per I.D. specification | 26.52 | Rm | - | - |
| 1.07 | Earth work including lead upto 30M & lift upto 1.5M, excluding mechanical compaction but including manual compaction and dressing to profile. For road/canal/flood embankment upto 1.5M height. | 143.4 | Cum | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.01 MB
BOQ_2228496.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .