Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹95,458Accepted-AOC | ₹95,458 | L-1 | Accepted-AOC As per TC recommendation, work award to L-1 bidder |
| 2 | L-2₹1.1 L+₹18,242 (19.1%)Rejected-Finance | ₹1.1 L+₹18,242 (19.1%) | L-2 | Rejected-Finance As per TC recommendation |
| 3 | L-3₹1.2 L+₹26,542 (27.8%)Rejected-Finance WARD NO 9 BHAGAT SINGH COLONY NEAR SINGRALI SINGRAULI | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | ₹1.2 L+₹26,542 (27.8%) | L-3 | Rejected-Finance As per TC recommendation |
| Sl No | Description | Qty | Unit | SAF ASSOCIATES L1 | M s Banarsilal and Sons Associates L3 | M/s V A BROTHERS L2 |
|---|---|---|---|---|---|---|
| 1.01 | Installation and Shifting, loading/ unloading of Pump-Motor-Pontoon-Starter-Field Switches-Pipelines (flexible and/or MS and/or GI etc)- Cables- Hoses along with all other accessories and alignment of pump-motor set before or during Monsoon as and when required for monsoon 2026 as per instructions of EIC. Note: The bidder will quote rate inclusive of tools and tackles charge and contractor profit. | 6 | Job | 8,678 ₹52,068 Lowest | 12,000 ₹72,000 | 12,000 ₹72,000 |
| 1.02 | Dismantling and Shifting, loading/unloading of Pump-Motor-Pontoon-Starter-Field Switches-Pipelines (flexible and/or MS and/or GI etc) - Cables- Hoses along with all other accessories before or during Monsoon as and when required for monsoon 2026 as per instruction of EIC. Note: The bidder will quote rate inclusive of tools and tackles charge and contractor profit. | 5 | Job | 8,678 ₹43,390 | 10,000 ₹50,000 | 8,340 ₹41,700 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.6 L
EMD Value
₹2,100
Closing Date
13 Mar 2026, 10:00 amClosed
Staff Officer (EnM),Krishnashila
Office of Staff Officer (EnM),Krishnashila Project
Installation Dismantling and Shifting of PumpMotorPontoonStarter Field Switches Pipelines flexible andor MS andor GI etc Cables Hoses along with all other related accessories before andor During Monsoon 2026 as and when required for monsoon
2026_NCL_355045_1
NCLKSLENMTender2025-26 16
Open Tender
Miscellaneous Works
Item Rate
120 days
Office of Staff Officer (EnM), Krishnashila
As per NIT
4 documents required · 4 mandatory
₹2,100
28 Jul 2026
2 Mar 2026
14 Mar 2026
2 Mar 2026
13 Mar 2026
3 Mar 2026
2 Mar 2026 - 9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Installation and Shifting, loading/ unloading of Pump-Motor-Pontoon-Starter-Field Switches-Pipelines (flexible and/or MS and/or GI etc)- Cables- Hoses along with all other accessories and alignment of pump-motor set before or during Monsoon as and when required for monsoon 2026 as per instructions of EIC. Note: The bidder will quote rate inclusive of tools and tackles charge and contractor profit. | 6 | Job | - | - |
| 1.02 | Dismantling and Shifting, loading/unloading of Pump-Motor-Pontoon-Starter-Field Switches-Pipelines (flexible and/or MS and/or GI etc) - Cables- Hoses along with all other accessories before or during Monsoon as and when required for monsoon 2026 as per instruction of EIC. Note: The bidder will quote rate inclusive of tools and tackles charge and contractor profit. | 5 | Job | - | - |
| 2 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_367887.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .