Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹4,592 (2.90%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.6 L+₹5,002 (3.15%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹8,200
Closing Date
25 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Development of Nichwin road with Protection Bund with slab near house of Nazir wani, Bashir Wani at Yeqbugh
2026_RDPR_319290_14
NIT_31_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
PARNEWA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹8,200
5 Oct 2026
4 Aug 2026
27 Aug 2026
4 Aug 2026
25 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of dry stone soling duly hand packed including carriages by all means | - | cum | 1 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size). 20% plum.including all carriages. | 1 | cum | - | - |
| 3 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm N. size). | 1 | cum | - | - |
| 4 | Steel reinforcement for RCC work including straightening, cutting, bending and providing in position complete job. | - | Kg | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of formwork for: Return Walls, R walls etc. | 8.55 | Sqm | 286.35 | ₹2,448.29 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of formwork for: Suspended floors. | 29.4 | Sqm | 718.2 | ₹21,115.08 |
| 7 | Add Provision for CIB<Photographs and painting for design of SBM Logo, Man hole cover 4No. as directed by Engineer incharge. | - | No. | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_1056716.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .