| 1 | 1₹2.3 CrAccepted-AOC | ₹2.3 Cr | 1 | Accepted-AOC agreement done as per letter attached letter recieved from division |
| 2 | 2₹2.3 Cr+₹2.5 L (1.11%)Rejected-Finance | ₹2.3 Cr+₹2.5 L (1.11%) | 2 | Rejected-Finance being L2 |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
22 Feb 2022, 5:30 pmClosed
E.E. WRD Ratlam
E.E. WRD Ratlam
Construction of Harkawalla nalla tank
2022_WRD_181630_1
873/2021-22/etendering/ Dt. 28.01.2022
Open Tender
Civil Works - Others
Turn-key
365 days
Ratlam
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
Yes
₹3.0 L
Yes
19 Apr 2022
31 Jan 2022
24 Feb 2022
31 Jan 2022
22 Feb 2022
1 Feb 2022
Amount
Construction of Harka walla nalla tank on local nalla near village Harka Tehsil Bajna District Ratlam on “Turn Key Basis” comprising of survey and investigation of project and preparation of land acquisition required for project, including planning and preparation of drawing, design and obtaining approval of drawing, design including all civil work by competent authority. Construction of Harkawala nalla tank with at least live capacity 0.9251 Mcum. with excavation of spill and approach channel, Cut of trench, foundation of sluice, chute fall, filter and boulder toe including earth work of dam, erection of sluice gate, construction of sluice well, chute fall, boulder toe and laying of filter blanket, pitching etc. all works as per departmental norms complete to irrigate command area 156 Hect and construction as per approved drawing and specification of MPWRD and as directed by Engineer in Charge as per detail Technical circular of department given in scope of works including defect liability period Two years after completion of work..
Construction of Harka walla nalla tank on local nalla near village Harka Tehsil Bajna District Ratlam on “Turn Key Basis” comprising of survey and investigation of project and preparation of land acquisition required for project, including planning and preparation of drawing, design and obtaining approval of drawing, design including all civil work by competent authority. Construction of Harkawala nalla tank with at least live capacity 0.9251 Mcum. with excavation of spill and approach channel, Cut of trench, foundation of sluice, chute fall, filter and boulder toe including earth work of dam, erection of sluice gate, construction of sluice well, chute fall, boulder toe and laying of filter blanket, pitching etc. all works as per departmental norms complete to irrigate command area 156 Hect and construction as per approved drawing and specification of MPWRD and as directed by Engineer in Charge as per detail Technical circular of department given in scope of works including defect liability period Two years after completion of work..
SHIVJI CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .