| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC | ₹12.6 L | L1 | Accepted-AOC Work Done |
| 2 | L2₹13.6 L+₹1.0 L (8.21%)Rejected-Finance GRAM KHEMPIPRA POST SAVAREJI THANA KOTWALI JANPAD MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | ₹13.6 L+₹1.0 L (8.21%) | L2 | Rejected-Finance Not Qualified |
| 3 | L3₹13.7 L+₹1.1 L (8.88%)Rejected-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | ₹13.7 L+₹1.1 L (8.88%) | L3 | Rejected-Finance Not Qualified |
| 4 | L4₹14.7 L+₹2.0 L (16.2%)Rejected-Finance | ₹14.7 L+₹2.0 L (16.2%) | L4 | Rejected-Finance Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualifyed Technical bid |
| Sl No | Description | Qty | Unit | M/S ARYA ENTERPRISES L3 | M/S VISHNU TRADERS L1 | M/S KRISHNA KANT TRIPATHI L2 | M/S ABHAY KUMAR JAISAWAL L4 |
|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in trench cutting for proper placing of brick ending with dressing to profile including cost of all lead & lift, labour, T&P etc. complete with proper disposal of earth required for proper completion of work as per direction of Engineer-in-charge. | 8.9 | m3 | 50 ₹445 | 90 ₹801 | 40.1 ₹356.89 Lowest | 45 ₹400.5 |
| 1.02 | Earth work in filling for making proper section and slope with dressing to profile including cost of all lead & lift, labour, T&P etc. complete with proper disposal of earth required for proper completion of work as per direction of Engineer-in-charge. | 1,808.36 | m3 | 150 ₹2,71,254 | 110 ₹1,98,919.6 Lowest | 165 ₹2,98,379.4 | 220 ₹3,97,839.2 |
| 1.03 | Supplying and laying local sand for preparation of sub grade for brick soling including cost of all lead & lift, material, labour, T&P etc. as per direction of Engineer-in-charge. | 45.67 | m3 | 700 ₹31,969 Lowest | 900 ₹41,103 | 885 ₹40,417.95 | 810 ₹36,992.7 |
| 1.04 | Dry brick on end soling including preparation of sub grade and filling joints with local sand including cost of sand, cost of all lead & lift, labour, T&P etc. complete as per direction of Engineer-in-charge. | 74.2 | m2 | 800 ₹59,360 Lowest | 955 ₹70,861 | 1,161 ₹86,146.2 | 1,008 ₹74,793.6 |
| 1.05 | Dry brick on edge soling including preparation of sub grade and filling joints with local sand including cost of sand, cost of all lead & lift, labour, T&P etc. complete as per direction of Engineer-in-charge. | 2,019.43 | m2 | 500 ₹10,09,715 | 470 ₹9,49,132.1 | 465 ₹9,39,034.95 Lowest | 473 ₹9,55,190.39 |
Tender Value
₹17.1 L
EMD Value
₹34,200
Closing Date
26 Feb 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
ID 2 Maharajganj
Laying brick soling/paving between km 0.000 to km 0.500 of Banraha Vistar embankment constructed on the left bank of Rohin river in Maharajganj district
2026_UPIDC_1118676_35
02/EE/2025-26
Open Tender
Civil Works
Item Rate
MAHARAJGANJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹34,200
Yes
21 Sept 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in trench cutting for proper placing of brick ending with dressing to profile including cost of all lead & lift, labour, T&P etc. complete with proper disposal of earth required for proper completion of work as per direction of Engineer-in-charge. | 8.9 | m3 | - | - |
| 1.02 | Earth work in filling for making proper section and slope with dressing to profile including cost of all lead & lift, labour, T&P etc. complete with proper disposal of earth required for proper completion of work as per direction of Engineer-in-charge. | 1,808.36 | m3 | - | - |
| 1.03 | Supplying and laying local sand for preparation of sub grade for brick soling including cost of all lead & lift, material, labour, T&P etc. as per direction of Engineer-in-charge. | 45.67 | m3 | - | - |
| 1.04 | Dry brick on end soling including preparation of sub grade and filling joints with local sand including cost of sand, cost of all lead & lift, labour, T&P etc. complete as per direction of Engineer-in-charge. | 74.2 | m2 | - | - |
| 1.05 | Dry brick on edge soling including preparation of sub grade and filling joints with local sand including cost of sand, cost of all lead & lift, labour, T&P etc. complete as per direction of Engineer-in-charge. | 2,019.43 | m2 | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.29 MB
35.pdf
Tender Documents • 1.35 MB
BOQ_2079654.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .