Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 13 29 3RD FLOOR EAST PATEL NAGAR NEW DELHI 110 008 | WEST | DELHI | 110008 | ₹1.5 Cr | L1 | Accepted-AOC AOC is being issued to the lowest bidder. |
| 2 | L2₹1.5 Cr+₹2.7 L (1.83%)Rejected-Finance B 2 46 SECTOR 18 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | ₹1.5 Cr+₹2.7 L (1.83%) | L2 | Rejected-Finance Rejected for being other than lowest |
| 3 | L3₹1.5 Cr+₹3.4 L (2.30%)Rejected-Finance | ₹1.5 Cr+₹3.4 L (2.30%) | L3 | Rejected-Finance Rejected for being other than lowest |
| 4 | L4₹1.5 Cr+₹4.3 L (2.91%)Rejected-Finance | ₹1.5 Cr+₹4.3 L (2.91%) | L4 | Rejected-Finance Rejected for being other than lowest |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
11 Oct 2019, 11:00 amClosed
CCE R N D DELHI
P-1 Building, Metcalfe House Complex, Delhi - 110054
Provision of Special Repairs to Five (05) Nos Chiller Units for HVAC Plant and Twenty (20) AHU Installed on Different Floors at DRDO Bhawan, New Delhi
2019_DRDO_498695_1
CCE R N D D/Repair/CHiller AHU/DRDO Bhawan/2019-20
Limited
Miscellaneous Works
Item Rate
240 days
New Delhi
Please refer Enquiry Document
4 documents required · 4 mandatory
₹2,000
CCE R N D DELHI
₹3.1 L
8 Jan 2020
29 Aug 2019
14 Oct 2019
29 Aug 2019
11 Oct 2019
29 Aug 2019
Amount
Supply, Installation, Testing and Commissioning of Kit Filter (364-50438-000) of Chillers.
Supply, Installation, Testing and Commissioning of Power Supply Wiring (571-03774-272) for Chiller No. 3.
Supply, Installation, Testing and Commissioning of Filter Drier 3/8 ORFS (026-37563-000) of Chillers.
Supply, Installation, Testing and Commissioning of Filter Drier 3/4 ORFS (026-43089-000) of Chiller No. 1 & 2.
Supply, Installation, Testing and Commissioning of Condenser & Evaporator flow switch Nylon male (024W26116-002) for Chiller No. 1 to 4 & condenser water flow switch for Chiller No. 5.
Supply, Installation, Testing and Commissioning of Seal Teflon Fiber 3/4 OD (028-12709-000) of Chillers.
Supply, Installation, Testing and Commissioning of O-Ring of ball valve size = 912,2.95,23.47 mm NEO1 N N/A (028-12961-006) of Chiller No. 1.
Supply, Installation, Testing and Commissioning of Angle Valve of liquid line drier filter ISNL angle SC 1/2in THD SC (022-09577-000) of Chiller No. 2.
Supply, Installation, Testing and Commissioning of Service Valve ISNL ball SC 1-1/16in CONmix Br (022-09757-000) of Chiller No. 1.
Supply, Installation, Testing and Commissioning of Gasket Service repl 25 F (028-09951-025) of Chiller No. 1, 2 & 5.
Supply, Installation, Testing and Commissioning of O-Ring set (HVCS000967 ANY) of Chiller No. 1 & 2.
Supply, Installation, Testing and Commissioning of MS Oil Return Pipe Line replacement of Chiller No. 1.
Descaling of Evaporator Tubes - 300 TR of Chillers.
Eddy Current Testing of condenser tubes 300 TR YR Chiller.
Provision of Compressor Oil York 'H' 5 Gal Can (011-00549-000).
Supply & Service of compressor for Chiller No. 1, 2, 3, 4 & 5.
Brg MATD set 7312 + QJ312
Brg Ball
Brg rolr cyl 151 mm
Brg roller cyl NU 2312EC
Slydring
Piston seal ring
O-Ring size 904, 1.83, 8.92 mm NEO 1N
O-Ring, 2-015, N1173
O-Ring Size = 910, 2.46, 19.18 mm NEO 1 N
O-Ring 2-155
O-Ring 2-159
O-Ring
O-Ring 2-359
O-Ring 2-388
O-Ring 2-392, N1173
O-Ring 2-394
O-Ring 3-903
O-RING 3-904
Gas'et O-Ring CSD = 1.981 mm IN HNBR
O-Ring 2-908
O-Ring Size = 910 2.46 19.18 mm HNBR M N/A
O-Ring 3-912
Moter Terminal, VRS Compr fiber
Gasket Round DN = 13-3/8in CL150
Gasket Round DN = 11in CL150 Compr fiber
SENSOR TEMPERATURE 50,000 DHMS
Overhauling of Compressor
Supply, Installation, Testing and Commissioning of Butterfly Valve at chiller side of size 200 mm.
Taking out old cooling coil & Supply, Installation, Commissioning and Testing of 6 RD copper cooling coil having total area of 35.01 sq feet, fin height 1524 mm, fin length 2135 mm required for 17500 CFM AHU all complete as per requirement of Engineer-In-Charge.
Taking out old cooling coil & Supply, Installation, Commissioning and Testing of 6 RD copper cooling coil having total area of 28.05 sq feet, fin height 1460.50 mm, fin length 1785 mm required for 14000 CFM AHU all complete as per requirement of Engineer-In-Charge.
Supply, Installation, Testing and Commissioning of Butterfly Valve for AHU input & output side of size 80 mm for 17500 & 14000 CFM.
Taking out old cooling coil & Supply, Installation, Commissioning and Testing of 6 RD copper cooling coil having total area of 23.95 sq feet, fin height 1206.5 mm, fin length 1845 mm required for 12000 CFM AHU all complete as per requirement of Engineer-In-Charge.
Supply, Installation, Testing and Commissioning of Butterfly Valve for AHU input & output side of size 65 mm for 12000 CFM. (Make: Audco or equivalent)
Provision of GI nut, Bolt & Washer of size 150/16 mm for mounting of butterfly valves.
Provision and Filling of R-134A gas for 05 Nos Chillers reprocessing.
Aircon Technique Pvt Ltd
STAHL TECNIKS PVT. LTD.
SSC PROJECTS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .