Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAccepted-AOC | ₹11.6 Cr Quoted ₹12 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹12.1 CrRejected-AOC DIPHU HOUSE NO NIL WARD NO 6 DIPHU P O DIPHU KARBI ANGLONG PIN 782460 | KARBI ANGLONG | ASSAM | 782460 | ₹12.1 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | UMTANG TIMUNG L2 | HONSING TIMUNG L1 |
|---|---|---|---|---|---|
| 1.01 | Planning, Designing, and "Construction of HAMREN GUEST HOUSE (Assam Type)" at Hamren with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC2016 norms, NMC norms & IS Codes and guidelines complete in all respect.
Note- Plinth Area shall be measured for the actual constructed. | 1,303 | sqm | 57,400 ₹7.5 Cr | 57,000 ₹7.4 Cr |
| 1.02 | Planning, Designing, and Construction of RCC Deep Tube well, Septic Tank etc ie. Security Waiting Pavilion, OutDoor Toilet, Overhead Water Staging, DG Shed, Brick Drain around the Building, Storm Drain around the Boundary Wall etc. with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, NMC norms & IS Codes and guidelines complete in all respect.
Note- Plinth Area shall be measured for the actual constructed. | 1 | Job | 90,00,000 ₹90 L | 90,00,000 ₹90 L |
| 1.03 | Construction of internal Decoration including Carpet, Furniture, Wall Panelling for Conference Hall, 3D Work, Gypsum Ceiling. Wooden Ceiling. Doors, Wall Decoration, Projection System, Audio Discussion System, IT Requirement, HVAC (Heating Ventilation and Air Conditioning) at Guest House cum Conference Hall, Hamren, West Karbi Anglong | 1 | Job | 96,29,000 ₹96.3 L | 96,29,000 ₹96.3 L |
| 1.04 | Planning. Designing and Construction of Civil External works - Counter Fort Retaining Wall with Full Brick and Half Brick Boundary Wall Earth Cutting, Dismantling of old Building, Internal Road including Pathway and Parking area, Horticulture & Landscape, Main Entrance Gate, Approach Road etc., approval of the same by the Engineer-in-Charge | 1 | Job | 2,01,00,000 ₹2.0 Cr | 2,01,00,000 ₹2.0 Cr |
| 1.05 | Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT- Electrical Works such as Electrical sub station DG set, UPS System, LED Street light CCTV Solar photo voltaic power generation system, Access control system, LAN System, P Based EPABX system and Emergency Light and Illuminated digital signages with support & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer in charge. | 1 | Job | 70,00,000 ₹70 L | 70,00,000 ₹70 L |
Tender Value
₹10.6 Cr
EMD Value
₹21.2 L
Closing Date
18 Nov 2025, 1:00 pmClosed
CE, PWD(Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Construction of Guest House cum Conference Hall, Hamren, West Karbi Anglong
2025_PWBNH_48267_1
CE/TB-II(Bldg.)/79/2025/05 Dated Guwahati the, 19th Sept 2025
Open Tender
Civil Works - Building
730 days
Hamren
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
₹21.2 L
Yes
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
26 Feb 2026
27 Oct 2025
18 Nov 2025
27 Oct 2025
18 Nov 2025
4 Nov 2025
3 Nov 2025
Amount
Planning, Designing, and "Construction of HAMREN GUEST HOUSE (Assam Type)" at Hamren with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC2016 norms, NMC norms & IS Codes and guidelines complete in all respect. Note- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction of RCC Deep Tube well, Septic Tank etc ie. Security Waiting Pavilion, OutDoor Toilet, Overhead Water Staging, DG Shed, Brick Drain around the Building, Storm Drain around the Boundary Wall etc. with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incorporating stipulated specification and adopting NBC-2016 norms, NMC norms & IS Codes and guidelines complete in all respect. Note- Plinth Area shall be measured for the actual constructed.
Construction of internal Decoration including Carpet, Furniture, Wall Panelling for Conference Hall, 3D Work, Gypsum Ceiling. Wooden Ceiling. Doors, Wall Decoration, Projection System, Audio Discussion System, IT Requirement, HVAC (Heating Ventilation and Air Conditioning) at Guest House cum Conference Hall, Hamren, West Karbi Anglong
Planning. Designing and Construction of Civil External works - Counter Fort Retaining Wall with Full Brick and Half Brick Boundary Wall Earth Cutting, Dismantling of old Building, Internal Road including Pathway and Parking area, Horticulture & Landscape, Main Entrance Gate, Approach Road etc., approval of the same by the Engineer-in-Charge
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT- Electrical Works such as Electrical sub station DG set, UPS System, LED Street light CCTV Solar photo voltaic power generation system, Access control system, LAN System, P Based EPABX system and Emergency Light and Illuminated digital signages with support & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer in charge.
UMTANG TIMUNG (BID ID -286015)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tendernotice_2.pdf
PDF • 0.46 MB
SBD.pdf
Tender Documents • 9.79 MB
APPENDIX-IB.pdf
Additional Documents • 0.26 MB
VOLUME_I_II_III.rar
Additional Documents • 25.25 MB
BOQ_76746.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid