Loading…
Loading…
Tender Value
₹18.9 L
EMD Value
₹18,933
Closing Date
16 Oct 2026, 5:00 pm
EXECUTIVE ENGINEER
O/O E.E. L.I. DIVISION, BALESHWAR
KARANJABINDHA-II
2026_OLIC_142485_9
04/26-27dt24.09.2026
Open Tender
Civil Works - Lift Irrigation Schemes
Percentage
90 days
O/O E.E. L.I. DIVISION, BALIA
AS PER MENTION IN DTCN
3 documents required · 3 mandatory
₹7,080
₹18,933
Yes
5 Oct 2026
5 Oct 2026
22 Oct 2026
5 Oct 2026
16 Oct 2026
5 Oct 2026
5 Oct 2026 - 13 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of Foundation and plinth in hard soil including dressing and levelling of bed within initial lead of 50mtr.andlifi 1.5mtr etc complete as per the direction of the Engineer-in-charge. | 352.19 | Cum | 282.89 | ₹99,629.27 |
| 2 | Filling in foundation and plinth with sand including watering and ramming etc complete as per the direction of the Engineer-incharge. | 23.03 | Cum | 980.55 | ₹22,583.99 |
| 3 | Cement concrite(1:4:8) with 4cm size h.g.b. crusser broken metal of approved quality from approved quarry with ramming watering and curring etc.complete including cost , taxes, royality convence charges of all materials to work site,supply of cement T&P required etc.comelete as per the direction of the Engineer-incharge. | 1.98 | Cum | 6,241.41 | ₹12,358 |
| 4 | Fly Ash Brick masonary in CM (1:6) in F& P | 2.57 | Cum | 6,268.11 | ₹16,109.03 |
| 5 | Brick work with Fly Brick 25cm x 12cm x 8cm size having croshing strength not less than 100kg/cm2 to149kg/cm2 with dimensional tolerrance± 8% in cement morter (1:6) in superstructure work etc. complete as per the Engineer-incharge. | 7.11 | Cum | 6,301.44 | ₹44,803.22 |
| 6 | 2.5cm thick DPC in cement concrete (1:2:4)with 12 mm HGCB | 3 | Sqm | 410.06 | ₹1,230.18 |
| 7 | 12mm thick cement plaster in cement morter(1:6)finished smooth to brick work after racking out joints including watering and curring etc.complete including cost.taxes,royality convence charges of all materials to work site,supply of cement T&P required etc.comelete as per the direction of the Engineer-in-charge. | 137.67 | Sqm | 205.88 | ₹28,344.17 |
| 8 | Rigid smooth centering & shuttering for R.C.C. Works walls & fins including false work & dismateling them after 28 days of curing including cost of all materials complete as per direction of Egineer-In-Charge
a)Coloumn base & gread beam,plinth bend etc | 43.72 | sqm | 251.99 | ₹11,017 |
| 9 | b) Chhaja & Slab | 16.04 | Sqm | 594.44 | ₹9,534.82 |
| 10 | c )Lintel | 3.6 | Sqm | 331.34 | ₹1,192.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.12 MB
Tendernotice_2.pdf
PDF • 1.42 MB
BOQ_612046.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .