Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 CrAccepted-AOC PANA BAHADUR VPO HUMAYUNPUR DISTT ROHTAK 124406 | ROHTAK | ROHTAK | HARYANA | 124406 | ₹4.7 Cr | 1 | Accepted-AOC OK |
| 2 | 2₹4.7 Cr+₹3.2 L (0.68%)Rejected-AOC 218 26 CHAKRIYA PURI SONIPAT ROAD ROHTAK 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | ₹4.7 Cr+₹3.2 L (0.68%) | 2 | Rejected-AOC OK |
| 3 | 3₹4.7 Cr+₹7.2 L (1.56%)Rejected-AOC | ₹4.7 Cr+₹7.2 L (1.56%) | 3 | Rejected-AOC OK |
| 4 | 4₹4.7 Cr+₹9.9 L (2.14%)Rejected-AOC ROHTAK | ROHTAK | HARYANA | 124001 | ₹4.7 Cr+₹9.9 L (2.14%) | 4 | Rejected-AOC OK |
| 5 | 5₹5.2 Cr+₹50.7 L (10.9%)Rejected-AOC | ₹5.2 Cr+₹50.7 L (10.9%) | 5 | Rejected-AOC OK |
Tender Value
₹4.6 Cr
EMD Value
₹9.1 L
Closing Date
25 Aug 2022, 5:00 pmClosed
Executive Engineer
Sampla W/S Division, Rohtak
Estimate for Re- Construction of V.R. Bridge at RD 8287, 11210, 18999, 21317 and 22712 on Rohtak Link Drain
2022_HRY_234222_1
20221C5E58A2 E96F 4310 9D8A 5CF7B00B40F3160IRR
Open Tender
Civil Works
Works
300 days
Rohtak
3 documents required · 3 mandatory
₹15,000
₹9.1 L
Yes
Office of Executive Engineer
10 Nov 2022
12 Aug 2022
26 Aug 2022
12 Aug 2022
25 Aug 2022
12 Aug 2022
22 Aug 2022
Amount
[10.34]Providing and laying dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.
[11.73.2]Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer`s specifications including appropriate priming coat, preparation of surface, etc. complete. 2. On concrete work
[17.75]Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead.
[21.95.9]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 9. 1000 mm
[27.15]Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRTandH Specifications 2706 & 2200.
[27.51.3]Filler joint 3. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H specifications.
[35.6]Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. Including excavation for trimming for preparation of bed. Nominal excavation required for preparation of bed has been taken into account while making provision for labour.
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix)
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
[5.53.2]Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 2. above 600 mm dia
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar
[6.22.2.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.2. All works up to Plinth Level : M-15 grade plain cement concrete. (cement content considered @ 240 kg/cum)
[6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level
[6.25.2]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns
[6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
[9.57.1]Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 1. 75 mm diameter
Brick Masonry work in cement mortar 1:3 in F and P complete rate approved by CE/LCU in 7.21.1
Credit (Recovery) Of Dismantlement of Bricks. This item has been taken from already approved estimate vide CE LCU letter no 5025/3LCU/2021 dated 25.08.2021. ( Sr. No. 36)
Credit (Recovery) Of NP3 Used Pipe This item has been taken from already approved estimate vide CE LCU letter no 6528/3LCU/897/2022 dated 27.07.2022. ( Sr. No. 23)
Credit (Recovery) Of Steel This item has been taken from already approved estimate vide CE LCU letter no 6528/3LCU/897/2022 dated 27.07.2022. ( Sr. No. 22)
m/s omparkash contractor
Ishwar Singh Contractor
DHARAMPAL AND COMPANY
Naveen
M/s Mohla Construction Company
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .