Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹1,017 (0.55%)Admitted-Finance VILLAGE GANESHPUR P O ROUTHKHANA P S KHANAKUL DIST HOOGHLY PIN 712406 | HOOGHLY | WEST BENGAL | 712406 | L2 | Admitted-Finance | ||
| 3 | L3₹1.9 L+₹1,942 (1.05%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,800
Closing Date
24 Sept 2026, 1:00 pmClosed
Executive Engineer(Civil)
Office Of The Executive Engineer ( C ), Borough - XV, Kolkata Municipal Corporation, E/3, Circular Garden Reach Road Kolkata-700024.
PREPARATION AND ALLIED WORKS AT SURINAM GHAT ,WARD 134 IN CONNECTION WITH THE OBSERVANCE OF CHAAT PUJA FESTIVAL, 2026.
2026_KMC_1041821_1
KMC/EE(C)/Br- XV/134/021/2026-2027/R/P AND S
Open Tender
CIVIL WORKS
Percentage
45 days
Borough XV office
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,800
28 Sept 2026
14 Sept 2026
26 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)d)Silver Sand. Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible. 3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable. | 51.41 | M3 | 667 | ₹34,289.8 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 1.Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 7,440 | SQM | 10 | ₹74,400 |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 190 | EA | 245 | ₹46,550 |
| 131 | Estimated amount | - | - | - | - |
| 132 | Add: 9%SGST | 1 | LS | 13,091.41 | ₹13,091.41 |
| 133 | Add: 9%CGST | 1 | LS | 13,091.41 | ₹13,091.41 |
| 134 | 1% LWC | 1 | LS | 2,443.73 | ₹2,443.73 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2557710.xls
BOQ • 0.29 MB
TENDER.pdf
Tender Documents • 0.55 MB
CIVIL.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .