| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | ₹4.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 L+₹13,920 (2.99%)Rejected-AOC NO 56 4 625 010 | 625010 | ₹4.8 L+₹13,920 (2.99%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.0 L+₹38,432 (8.25%)Rejected-AOC NO 5D AGILA NAGAR 5TH CROSS EXTENSION GANAPATHY NAGAR SOUTH EXTENSION THIRUVANAIKOVIL TRICHY 5 | TRICHY | TRICHY | TAMIL NADU | ₹5.0 L+₹38,432 (8.25%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SHRI BALAJI CONSTRUCTION L2 | THIRUPPATHI M R L1 | S RAMANATHAN L3 |
|---|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10cum | 56 | m3 | 300 ₹16,800 | 294.71 ₹16,503.5 Lowest | 319.01 ₹17,864.62 |
| 2.01 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 6 | m3 | 675.34 ₹4,053.42 | 655.48 ₹3,934.18 Lowest | 709.54 ₹4,258.64 |
| 3.01 | Plain Cement Concrete 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation whenever necessary etc. complete. | 6 | m3 | 6,490.75 ₹38,957.5 | 6,299.81 ₹37,811.46 Lowest | 6,819.38 ₹40,929.93 |
| 4.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar, RCC slabs with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. Vertical Portion | 156 | m2 | 1,073.38 ₹1,67,446.59 | 1,041.8 ₹1,62,520.71 Lowest | 1,127.72 ₹1,75,924.48 |
| 5.01 | Cement concrete 1: 1 ½ : 3 (One cement one and half sand and three aggregates) with 20mm gauge machine broken gauge hard broken granite chips including curing and finishing etc., complete | 18 | m3 | 9,967.52 ₹1,79,415.29 | 9,674.3 ₹1,74,137.31 Lowest | 10,472.17 ₹1,88,499.15 |
| 6.01 | Add GST 18% | 1 | GST | 73,237.77 ₹73,237.77 | 71,083.29 ₹71,083.29 Lowest | 76,945.83 ₹76,945.83 |
Tender Value
₹4.8 L
EMD Value
₹4,804
Closing Date
23 Jan 2026, 10:00 amClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Providing Storm Water Drain Arrangement Bose Veethi Reach I in Ward No.23.
2026_MAWS_640869_1
Z2 / E1 / EST.505 / 2025-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,804
24 Aug 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10cum
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation whenever necessary etc. complete.
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar, RCC slabs with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. Vertical Portion
Cement concrete 1: 1 ½ : 3 (One cement one and half sand and three aggregates) with 20mm gauge machine broken gauge hard broken granite chips including curing and finishing etc., complete
Add GST 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
1.pdf
Tender Documents • 0.84 MB
BOQ_767512.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .