| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹48.6 L+₹2.3 L (5.07%)Accepted-Finance | L2 | Accepted-Finance Responsive | |
| 2 | L3₹60.0 L+₹13.8 L (29.8%)Accepted-Finance | L3 | Accepted-Finance Responsive | |
| 3 | L4₹60.1 L+₹13.8 L (29.9%)Accepted-Finance BANDH BARETHA BAYANA BHARATPUR 321405 | BHARATPUR | BHARATPUR | RAJASTHAN | 321405 | L4 | Accepted-Finance Responsive | |
| 4 | L5₹60.8 L+₹14.6 L (31.5%)Accepted-Finance | L5 | Accepted-Finance Responsive | |
| 5 | L6₹61.7 L+₹15.4 L (33.3%)Accepted-Finance | L6 | Accepted-Finance Responsive |
Tender Value
₹78 L
EMD Value
₹1.6 L
Closing Date
18 Mar 2024, 6:00 pmClosed
EE ADA Ajmer
ADA, Ajmer
Providing Installation and Commissioning of Solar Power Plants at ADA Buildings Ajmer
2024_ADA_387333_1
ADA/Technical/2023-24/542-55 (1) date 07.03.2024
Open Tender
Electrical Works
Item Wise
180 days
ADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
ADA, Ajmer
₹1.6 L
Yes
1 Apr 2024
7 Mar 2024
19 Mar 2024
7 Mar 2024
18 Mar 2024
7 Mar 2024
Amount
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthingmounted on Aluminium/GI structure of suitable strength with followincomponents complete as required:a) Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. SolaPhotovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watcapacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugand other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPinsulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along witsupplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.
SANKALP REALMART PVT LTD
Kadam Electricals and Energy Power
ANKUR CONSTRUCTIONS & SUPPLIERS
Current Infraprojects Pvt Ltd
shree bala ji electricals
ASHISH ELECTRIC DECORATORS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_690172.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .