| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | +0.00% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹2,821 (0.95%)Admitted-Finance | +0.95% | ₹3.0 L+₹2,821 (0.95%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹3,118 (1.05%)Admitted-Finance | +1.05% | ₹3.0 L+₹3,118 (1.05%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
22 Aug 2026, 11:00 amClosed
Executive Engineer(Civil)
Office Of The Executive Engineer ( C ), Borough - XV, Kolkata Municipal Corporation, E/3, Circular Garden Reach Road Kolkata-700024.
REPAIRING OF PAVER BLOCK PASSAGE WITH ALLIED WORKS AT SHAHI ASTHABOL AND OTHER AREA IN WARD NO-134, BR XV UNDER UTTARAN SERVICE.
2026_KMC_1037622_1
KMC/XV/134/012/2026- 2027/R/UTTARAN
Open Tender
CIVIL WORKS
Percentage
Borough XV office
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
31 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
22 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand | 50.91 | M3 | 990.4 | ₹50,421.21 |
| 2 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 339.42 | SQM | 24 | ₹8,146.08 |
| 3 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion | 25.46 | M3 | 4,572 | ₹1,16,403.12 |
| 4 | Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete | 312.15 | SQM | 124 | ₹38,706.97 |
| 5 | SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENT (ICBP) WITH CONCRETE BLOCK (WITH CONCRETE GRADE AS SPECIFIED AS PER TABLE 1 OF IS 15658 :2006) MANUFACTURED FROM BIS LICENSEE MANUFACTURER ,WITH SPACER NIB (SMALL PROTRUDING PROFILES ON THE VERTICAL FACE OF PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCK ,AS PER CI NO3.26 OF IS 15658) AND SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO (THE RATIO OF LENGTH TO THICKNESS OF A PAVER BLOCK ,AS PER CI NO3.3 OF IS:15658)AS PER TABLE 2 OF IS:15658 WITH FLEXURAL STRENGTH /BREAKING LOAD AS PER ANNEXURE G OF IS:15658 AND COMPLETING THE EDGE WITH CUT BLOCKS AS PER CI NO 8.7 OF IRC SP -63(2018) WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND ,COMPACTION ,LEVELLING AND FILLING UP OF THE EDGE GAPE 50MM THICK (II) COLOURED DECORATIVE | 27.15 | SQM | 875 | ₹23,756.25 |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 48 | EA | 245 | ₹11,760 |
| 131 | Estimated amount | - | - | - | - |
| 132 | Add: 9%SGST | - | LS | 13,091.41 | - |
| 133 | Add: 9%CGST | - | LS | 13,091.41 | - |
| 134 | 1% LWC | - | LS | 2,443.73 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
TENDER.pdf
Tender Documents • 0.52 MB
BOQ_2548935.xls
BOQ • 0.30 MB
ROAD.pdf
Additional Documents • 5.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .