Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance BOHAL PARA PO KULTI BARDHAMAN 713343 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713343 | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 LAdmitted-Finance | ₹3.3 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not as per NIT |
| Sl No | Description | Qty | Unit | MAKEWELL ENGINEERS L2 | B K AND BROS ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Items Description | |||||
| 2.00Repairing of 3rd Motion and 2nd Motion 24 teeth Pinions of PIT No.01 Winding Installation of Patmohana Colliery under Sodepur Area. | |||||
| 2.01 | Dismantle of drum pinion side block | 1 | Nos. | 7,000 ₹7,000 | 6,000 ₹6,000 |
| 2.02 | Open of drum side pinion bolt nut & plate | 1 | Nos. | 9,000 ₹9,000 | 8,000 ₹8,000 |
| 2.03 | Hanging of 2 half pinion both side | 1 | Nos. | 10,500 ₹10,500 | 10,000 ₹10,000 |
| 2.04 | Two half pinion bore metal deposit both portion | 1 | Nos. | 15,700 ₹15,700 | 15,000 ₹15,000 |
| 2.05 | Grinding of bore at shaft size | 1 | Nos. | 10,000 ₹10,000 | 9,000 ₹9,000 |
| 2.06 | Requirement of Cl welding rod - 3 Kg | 1 | Nos. | 17,000 ₹17,000 | 15,000 ₹15,000 |
| 2.07 | Refitting of drum side pinion proper place | 1 | Nos. | 17,000 ₹17,000 | 16,000 ₹16,000 |
| 2.08 | Dismantle of block bush 1st & 2nd motion | 1 | Nos. | 15,500 ₹15,500 | 14,000 ₹14,000 |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
9 Mar 2026, 1:00 pmClosed
Area Engineer(EnM)
Area Engineer(EnM),Sodepur Area
Repairing of 3rd Motion and 2nd Motion 24 teeth Pinions of PIT No.01 Winding Installation of Patmohana Colliery under Sodepur Area.
2026_ECL_354796_1
ECL/SDPA/AE(EnM)/e/25-26/366 dt.26.02.2026
Open Tender
Miscellaneous Works
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,900
20 Mar 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
27 Feb 2026 - 1 Mar 2026
Items Description
Repairing of 3rd Motion and 2nd Motion 24 teeth Pinions of PIT No.01 Winding Installation of Patmohana Colliery under Sodepur Area.
Dismantle of drum pinion side block
Open of drum side pinion bolt nut & plate
Hanging of 2 half pinion both side
Two half pinion bore metal deposit both portion
Grinding of bore at shaft size
Requirement of Cl welding rod - 3 Kg
Refitting of drum side pinion proper place
Dismantle of block bush 1st & 2nd motion
Hanging gear box pinion with shaft 1st & 2nd motion
2nd motion big & small pinion dismantle by hydraulic press
Requirement of 2nd motion 24 teeth
Refitting of 2" motion big & small 24 teeth pinions by press
Fitting of gear box 1st motion & 2nd motion pinion
Fitting of block bush 1st & 2nd motion pinion
Complete alignment of winder gear box smooth running
Overhead cost and others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_367626.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid