Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹56.6 LAccepted-AOC | 1 | Accepted-AOC lowest | |
| 2 | 2₹66.6 L+₹10.0 L (17.7%)Rejected-AOC NOT AVAILABLE | 2 | Rejected-AOC 2nd lowest |
| Sl No | Description | Qty | Unit | Arise New Energy L1 | Khehra Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. (Depth upto 1.5 mtr.) | 1 | Cum | 99 ₹99 Lowest | 104 ₹104 |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. (Depth upto 1.5 to 2.25 mtr.) | 1 | Cum | 105 ₹105 Lowest | 110 ₹110 |
| 3.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. (Depth upto 2.25 to 3 mtr.) | 1 | Cum | 119 ₹119 Lowest | 129 ₹129 |
| 4.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 213 ₹213 Lowest | 220 ₹220 |
| 5.00 | First class burnt brick works laid in 1:6 cement sand mortar in foundation and plinth including supply recarriage of bricks, cement (item no.11.3(i)) | 1 | Cum | 10,200 ₹10,200 Lowest | 11,200 ₹11,200 |
| 6.00 | 10mm thick cement plaster 1:4 on side walls (-) Rs. 1.25/- for scaffolding. (Item No. 15.6) | 1 | sqm | 196 ₹196 Lowest | 202 ₹202 |
| 7.00 | 10mm thick cement plaster 1:4 on bed & top | 1 | sqm | 153 ₹153 Lowest | 160 ₹160 |
| 8.00 | RCC 1:2:4 Hand Mixed including steel reinforcement (item No. 10.13a (i) | 1 | Cum | 11,255 ₹11,255 Lowest | 11,300 ₹11,300 |
| 9.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 6,225 ₹6,225 Lowest | 6,285 ₹6,285 |
| 10.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | 4,600 ₹4,600 Lowest | 4,700 ₹4,700 |
Tender Value
₹53.9 L
EMD Value
₹1.1 L
Closing Date
2 Sept 2026, 9:00 amClosed
Dinesh Tayal
Devigarh PWRMDC Division Sangrur
Lining/Relining of w/c by Laying of Underground pipeline of outlet RD 3200-R Slice-1 of Mavi Mr. of vill Mavi Sappan of Distt. Patiala (PDC Project)
2026_WR_164401_36
06/2026
Open Tender
Civil Works
Item Rate
Patiala
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹1.1 L
28 Sept 2026
27 Jul 2026
2 Sept 2026
27 Jul 2026
2 Sept 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. (Depth upto 1.5 mtr.) | - | Cum | - | - |
| 2 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. (Depth upto 1.5 to 2.25 mtr.) | - | Cum | - | - |
| 3 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. (Depth upto 2.25 to 3 mtr.) | - | Cum | - | - |
| 4 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | Cum | - | - |
| 5 | First class burnt brick works laid in 1:6 cement sand mortar in foundation and plinth including supply recarriage of bricks, cement (item no.11.3(i)) | - | Cum | - | - |
| 6 | 10mm thick cement plaster 1:4 on side walls (-) Rs. 1.25/- for scaffolding. (Item No. 15.6) | - | sqm | - | - |
| 7 | 10mm thick cement plaster 1:4 on bed & top | - | sqm | - | - |
| 8 | RCC 1:2:4 Hand Mixed including steel reinforcement (item No. 10.13a (i) | - | Cum | - | - |
| 9 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | - | Cum | - | - |
| 10 | Cement concrete 1:4:8 with brick ballast 40mm gauge | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
TECH3200RS1.xls
Tender Documents • 0.07 MB
BOQ_351090.xls
BOQ • 0.28 MB
Corriof07of06of2026.pdf
PDF • 0.17 MB
Corrigendum06of06of2026.pdf
PDF • 0.17 MB
5.pdf
PDF • 0.17 MB
41208.pdf
PDF • 0.16 MB
Corri03of06of2026.pdf
PDF • 0.48 MB
Corri02of06of2026.pdf
PDF • 0.48 MB
Corri01of06of2026.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .