Tender Value
Refer Docs
EMD Value
₹8,200
Closing Date
28 Mar 2023, 12:00 pmClosed
Superintending Engineer (EWCL)
Type-IV/3, Transmission Staff Colony Dewa Road, Chinhat Lucknow
Increasing capacity of 33/11 KV Sub-station PD Nagar, Distt.- Unnao from 2x5 MVA to 1x5 Plus 1x10 MVA T/F. Under Nagar Nikay Scheme
2023_MVVNL_781295_1
36/EWCL/2022-23
Open Tender
Electrical Works
Fixed-rate
90 days
33/11 KV Sub-station PD Nagar, Distt.- Unnao
As per tender documents
2 documents required · 2 mandatory
₹1,180
A/c No. 0758002100009592, IFSC PUNB0586800
₹8,200
1 Apr 2023
4 Mar 2023
28 Mar 2023
4 Mar 2023
28 Mar 2023
4 Mar 2023
Amount
Safe loading, carriage and unloading & proper stacking of following store materials from any Electy. Store of Lucknow Zone to 33/11 KV S/S P. D. Nagar, Unnao site (work site).
Cost of 33 KV Lightening Arrester
11 KV 3x300 SQ MM XLPE
11 KV 3x120 SQ MM XLPE
11 KV 3x300 SQ MM XLPE Cable Outdoor
11 KV 3x300 SQ MM XLPE Cable Indoor
11 KV 3x120 SQ MM XLPE Cable Outdoor
11 KV 3x120 SQ MM XLPE Cable Indoor
Single Core PVC Cable, 1x400 sq.mm.
Dismantling & safe shifting of existing & working 33/11 KV 05 MVA T/F from plinth to suitable storage place after opening jumper and cable connections as per instruction of Site Engineer.
Repairing and extension of Power Transformer Plinth for 10 MVA T/F.
Earthing for power T/F by way of boring and lowering of 40mm dia, 2.9 mm thick GI Pipe B class from ground upto the water level (minimum 60 feet deep) as per standard practice as per RESPO/REC Drg with making of earth pit of 300x300 mm & 1 feet deep with Cover. (All materials to be provided by Contractor).
Installation of Lightening Arrestors : Assembling, installation & mounting of 3 No.(1set) L.A. on the L.A Structure/complete with making earth connections (separate) with GI Strip 50x6mm. The work includes fabrication for fixing if required. (All decentralised materials to be provided by Contractor).
Painting of all structures and equipments with good quality ISI Mark one coat of red oxide primer & two coats of Aluminium Paint. (All materials to be provided by Contractor).
HT Cable Laying :
Laying & dressing of 11KV 3x300 Sq.mm XLPE cable from 5MVA T/F to 11KV incoming Switchgear by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
Laying & dressing of 11KV 3x120 Sq.mm XLPE cable from 11KV Outgoing Switchgear to outgoing double pole by excavation of trench in the ground of size 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All decentralised materials to be provided by Contractor).
Earthing of 11 KV, 33 KV Switchgears & Equipment : Earthing of 11 KV, 33 KV Switchgears equpiment by lowaring and boring of Chemical Earthing outside of switchyard and connecting through G.I. Strip 50x6mm with indoor/outdoor equipments with making of earth pit of 300x300 mm & 1 feet deep with Cover. (All the material provided by the contractor)
Hoisting of 11KV Cable with 100 mm dia 3 Mtr. long GI Pipe on the feeder cable before mounting the cable on the double pole, lifting, mounting and clamping of 11KV feeder cable boxes on the feeder double pole structure and making connection including supply of cable mounting clamps. The work includes the sealing of GI Pipes, lower end of the pipe is to be buried into the earth by about one foot.(All decentralised materials to be provided by Contractor).
Hoisting of 11KV XLPE Cable for 11 KV switchgears & 33/11KV T/F of requried size.
Supply and laying of following size Copper Control Cable through underground/cable trench/trenching SGR interlinking through proper connections to T/F Control panel/protection board/Battery and Battery Charger/Bunch joints, Relay 33/11KV T/F junction Box/33KV VCB, CTs etc. as per site conditions:
4x2.5 Sq.mm
Fixing of Single Core PVC Cable, 1x240/400/630 sq.mm. & fixing between Transformer incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing.
M/S S K ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .