| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹1.8 Cr | 1 | Accepted-AOC Lowest |
| 2 | 2₹1.8 Cr+₹4.4 L (2.43%)Rejected-AOC | ₹1.8 Cr+₹4.4 L (2.43%) | 2 | Rejected-AOC Higher |
| 3 | 3₹1.9 Cr+₹12.9 L (7.17%)Rejected-AOC | ₹1.9 Cr+₹12.9 L (7.17%) | 3 | Rejected-AOC Higher |
| 4 | 4₹1.9 Cr+₹13.3 L (7.40%)Rejected-AOC | ₹1.9 Cr+₹13.3 L (7.40%) | 4 | Rejected-AOC Higher |
| 5 | 5₹1.9 Cr+₹15.4 L (8.61%)Rejected-AOC NEAR SHIV MANDIR VILLAGE RAJPURA KHARKARI TEHSIL AND DISTRICT BHIWANI 127031 | BHIWANI | HARYANA | 127031 | ₹1.9 Cr+₹15.4 L (8.61%) | 5 | Rejected-AOC Higher |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
11 Jul 2022, 1:00 pmClosed
EE PHED no 1 Bhiwani
EE PHED no 1 Bhiwani
ASALWAS MARETHA PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTIONS and PROVIDING INDEPENDENT WATER WORKS REPLACEMENT OF DI PIPE LINES and PROVIDING RAW WATER PUMPING STATION AT JUI CANAL UNDER JJM FOR VILLAGE ASALWAS MARETHA DISTRICT BHIWANI
2022_HRY_228214_1
SE PHED Memo no 6482 dated 09.05.2022
Open Tender
Civil Works
Works
180 days
Bhiwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
Yes
₹4.3 L
Yes
4 Aug 2022
1 Jul 2022
11 Jul 2022
1 Jul 2022
11 Jul 2022
1 Jul 2022
Amount
NS Item
PUMPING MACHINERY RAW WATER PUMPING MACHINERY Supplying, erection, testing and commissioning of Horizontal motor pumping set for raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked. RAW WATER PUMPING STATION 1800 LPM X 35 M. Head
WATER WORKS 1200 LPM X 12 M. Head
PANEL BOARDS FOR MOTORS Supply, erection, testing & commissioning of wall mounted electrical L.T. Panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200 x 900 mm and 400 mm deep having follwing items Ref. no. 1.1.1: For 1 no Pumping Sets of 1800 LPM x 35 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 1 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 1800 LPM x 35 m Head = 1 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 1 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each)
Ref. sr. no. 1.1.2 :For 1 no Pumping Sets of 1200 LPM x 12 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 1 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 1200LPM x 12 m Head = 1 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 1 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each)
For clear water : For 1 no Pumping Sets of 1200 LPM x 40 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 1 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 1200 LPM x 40 m Head = 1 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 1 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each)
Supply, erection, testing & commissioning of IS marked copper wire for various motors with underground system in PVC and flexible pipes copper wire 3 core complete in all respevts with accessories like thimble etc. 10mm2 3core
25mm2 3core
Supply & Fixing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect. 150 mm i/d
Supply erection testing of reputed make LED light 100 wats with fittings and accessories complete in all repects.
Operation & Maintenance Operation & maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. (Will be charged to A/mtc estimate)." Defect liability period (Operational only)
Operation & maintenance during 1st year
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
Ravinder Sharma Contractor(GSTN-06APJPR8270D1ZO)
SH. DEVENDER SINGH CONTRACTOR(GSTN-NA)
BALJIT SINGH CONTT(GSTN-NA)
DHARAMBIR GROVER CONTRACTOR(GSTN-NA)
RAM PHAL SINGH CONT(GSTN-NA)
MAHA LAXMI CONSTRUCTION COMPANY(GSTN-NA)
RAM PHAL SINGH CONT
BALJIT SINGH CONTT
SH. DEVENDER SINGH CONTRACTOR
Ravinder Sharma Contractor
DHARAMBIR GROVER CONTRACTOR
MAHA LAXMI CONSTRUCTION COMPANY
Ravinder Sharma Contractor
RAM PHAL SINGH CONT
BALJIT SINGH CONTT
DHARAMBIR GROVER CONTRACTOR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .