Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹21,500
Closing Date
11 Jun 2026, 9:30 pm6d left
Rural Development and Panchayat Raj Department
Development of Karidevar temple at Aralagundagi village in Jewargi Taluka under CM Special Fund for the year 2024-25.
303068
RDPR/2026-27/BD/WORK_INDENT26927
Open
Buildings
RDPR Division Office Kalaburgi
4 documents required · 4 mandatory
₹500
₹21,500
2 Jun 2026
2 Jun 2026
11 Jun 2026
Development of Karidevar temple at Aralagundagi village in Jewargi Taluka under CM Special Fund for the year 2024-25.
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ram...
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Reinforced cement concrete for all Sub structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m he...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
For Centering Charges with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and directi...
For Centering Charges with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and directi...
For Centering Charges with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and directi...
For Centering Charges with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and directi...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking,...
Providing Half brick masonry with common burnt clay Non Modular
bricks of class designation 3.5 in superstructure above plinth level up
to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) inc...
Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:3 (1 cement: 3 fine sand) including rounding off corners
wherever required smooth rendering, providing and removi...
Finishing walls with Acrylic Smooth exterior paint of required shade :New
work (Two coat applied @ 1.67L/10 m² over and including priming coat of
exterior primer applied @ 2.20 kg/10 m²) with paint ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
16 works 11 June 26.zip
Tender Document • 2.95 MB
Download all tender documents and submit your bid