| Sl No | Description | Qty | Unit | MAARFAT CONSTRUCTION L2 | M/S. SRI SATYA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Insulation of Pipe dia-25 mm, Thickness of Insulation-25 mm & installation of old Aluminum Cladding | 20 | M2 | 220 ₹4,400 | 201 ₹4,020 Lowest |
| 2.00 | Insulation of Pipe dia-25 mm, Thickness of Insulation-50 mm & installation of old Aluminum Cladding. | 20 | M2 | 317 ₹6,340 | 290 ₹5,800 Lowest |
| 3.00 | Insulation of Pipe dia-50 mm, Thickness of Insulation-75 mm & installation of old Aluminum Cladding. | 20 | M2 | 400 ₹8,000 | 365 ₹7,300 Lowest |
| 4.00 | Insulation of Pipe dia-100 mm, Thickness of Insulation-75 mm & installation of old Aluminum Cladding | 50 | M2 | 400 ₹20,000 | 365 ₹18,250 Lowest |
| 5.00 | Insulation of Pipe dia-150 mm, Thickness of Insulation-100 mm & installation of old Aluminum Cladding | 40 | M2 | 533 ₹21,320 | 487 ₹19,480 Lowest |
| 6.00 | Insulation of Pipe dia-200 mm, Thickness of Insulation-100 mm & installation of old Aluminum Cladding. | 40 | M2 | 533 ₹21,320 | 487 ₹19,480 Lowest |
| 7.00 | Insulation of Pipe dia-250 mm, Thickness of Insulation-125 mm & installation of old Aluminum Cladding | 70 | M2 | 593 ₹41,510 | 542 ₹37,940 Lowest |
| 8.00 | Insulation of Pipe dia-300 mm, Thickness of Insulation-125 mm & installation of old Aluminum Cladding. | 40 | M2 | 593 ₹23,720 | 542 ₹21,680 Lowest |
| 9.00 | Insulation of Pipe dia-400 mm, Thickness of Insulation-150 mm & installation of old Aluminum Cladding. | 50 | M2 | 672 ₹33,600 | 614 ₹30,700 Lowest |
| 10.00 | Fixing of Aluminum (24SWG) cladding on various pipeline. | 30 | M2 | 437 ₹13,110 | 400 ₹12,000 Lowest |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
11 Oct 2025, 6:00 pmClosed
SE-II, 2x200MW, BTPS, Obra
SE-II, 2x200MW, BTPS, Obra
Work of Insulation of Turbine, Valves, Pipelines of turbine side during Overhauling of unit 13, BTPS, Obra
2025_RVUNL_1057704_1
OBR/6000008928_00/SE2/TMD2
Open Tender
Miscellaneous Works
Fixed-rate
30 days
BTPS, Obra
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Dy CAO, CFA and BO BTPS, Obra
₹6,000
17 Nov 2025
16 Jul 2025
14 Oct 2025
16 Jul 2025
11 Oct 2025
16 Jul 2025
16 Jul 2025 - 11 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .