Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹25.8 L+₹1.8 L (7.59%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
Refer Docs
Closing Date
15 Jul 2021, 3:00 pmClosed
Additional Collector
DRDA,Collectorate,Erode.
Erode District PMGSY Periodic Renewal of PMGSY roads 1 No. Group No. TN 12-02 (R) Kodumudi Block (OLD PACKAGE NO. TN 12-01) under Incentive Grant 2020-21
2021_RDTN_111424_1
Roc No 26095/2021/TU4 dated 22.06.2021
Open Tender
Civil Works - Roads
Item Rate
120 days
Kodumudi, Erode District
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
Exempted
DRDA,Collectorate,Erode.
22 Sept 2021
29 Jun 2021
15 Jul 2021
29 Jun 2021
15 Jul 2021
2 Jul 2021
2 Jul 2021
Amount
Clearing the Scrub jungle including all labour charges for burrying and burning etc. Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees cut earlierand disposal of unserviceable materials to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. Km 0/0 -1/620
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc, complete. As per SS20 A
Providing and laying WBM Patch work using 1 cum of 45mm IRC HBG metal and 0.33 cum Gravel for blindage for including cost and conveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement as directed by departmental officers including labour form spreading metal and gravel hand picking to camber and grade lines blinding with required quantity of gravel
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal premixed with 44kg of of bitumen per Cu.m of metal including cost and conveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement including ( bitumen which will be supplied by the department and the cost recovered by the issued rate) heating bitumen,premixing,laying and tamping including all labour charges for patch work and hire charges,running and fuel charges for all tools and plants employed and all other incidental charges etc.,complete
Applying Tack coat over BT surface (not treated with primer) using 3 kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual workspot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification
PREMIX CARPET Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and type C as per technical specifications clause 510
Maintenance of the existing pmgsy Name board, Logo board, New board for periodical maintance
Citizen Information Board
Name Board painting
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI BALAJI AND CO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .