Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.3 L
EMD Value
₹16,605
Closing Date
12 Nov 2026, 2:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Abohar Canal and Ground Water
Executive Engineer, Abohar Canal and Ground Water
Estimate for Permanent Plugging of breach by Brick Linning RD 17650, RD 19320 , RD 31100, RD 88392 of Bhagsar Minor
2026_WR_177317_11
E-Tendering Notice No.24/Abohar Canal Ground Water Division /2026-27Dated 12/10/2026
Open Tender
Civil Works - Others
Item Rate
FAZILKA
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Yes
₹16,605
Yes
12 Nov 2026
4 Nov 2026
12 Nov 2026
4 Nov 2026
12 Nov 2026
4 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of soil using hydraulic excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment all locations including all lifts and leads. | 54.14 | cum | - | - |
| 2 | Earthwork Excavation from canal using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m cutting. | 316.31 | cum | - | - |
| 3 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications. | 408.2 | cum | - | - |
| 4 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth. | 47.83 | cum | - | - |
| 5 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 1.5 to 3.0 mtr depth. | 14.4 | cum | - | - |
| 6 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 4.64 | cum | - | - |
| 7 | Laying 1st class brick lining 75 mm thick laid in 1:3 CSM over
10 mm thick cement Plaster 1:3 over 12.5 mm thick cement plaster 1:5 over dressed sub grade (for side slopes) including supply carriage, loading and unloading of material from source to site of work complete in all respects as per
PWD specification. | 798.93 | Sq.Mtr | - | - |
| 8 | Laying 1st class brick on edge coping 229 mm wide and 115 mm thick in cement sand mortar 1:3 complete in all respects as per PWD specification. | 160.63 | Running meter | - | - |
| 9 | Extra allowance for providing templates in curved portions of lining. | 160.67 | Sq.Mtr | - | - |
| 10 | Any other item | 1 | CSR+SP | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Tendernotice_2.pdf
PDF • 0.13 MB
Tendernotice_3.pdf
PDF • 0.54 MB
BOQ_365246.xls
BOQ • 0.28 MB
SBDpatchplugging2.pdf
Tender Documents • 0.15 MB
Corrigendum08.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .