Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.7 LAccepted-Finance | ₹54.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹59.8 LRejected-Finance YAVATMAL | ₹59.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹61.3 LRejected-Finance | ₹61.3 L | L3 | Rejected-Finance L3 |
| 4 | L4₹62.9 LRejected-Finance | ₹62.9 L | L4 | Rejected-Finance L4 |
| 5 | L5₹67.3 LRejected-Finance | ₹67.3 L | L5 | Rejected-Finance L5 |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
20 Jul 2026, 5:00 pmClosed
Additional Chief Executive officer, Zilla Parishad
Executive Engineer Works Division No.1, Z.P.Yavatmal
IMPROVEMENT TO S H NO 316 JOIN TO TALANI KOLI BU KOLI KH UNDARNI RAMPUR SAYATKARDA ZATALA KURLI WAGARTAKALI ROAD ODR NO 78 IN KM NO 4/00 TO 8/800 , 2/00 TO 2/800 AND 27/00 TO 32/00 TOTAL LENGTH 32/100 KM TQ - GHATANJI DISST - YAVATMAL
2026_YAVAT_1314487_14
NIT-2/2026-2027
Open Tender
Civil Works
Percentage
180 days
GHATANJI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1 L
1 Aug 2026
4 Jul 2026
21 Jul 2026
4 Jul 2026
20 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . 2.07 | 4,500 | SQM | 4 | ₹18,000 |
| - | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. 2.18 | 1,440 | Cum | 119 | ₹1,71,360 |
| - | Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. 3.09 | 5,250 | SQM | 47 | ₹2,46,750 |
| - | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). 50.57 | 187.5 | Cum | 1,158.45 | ₹2,17,209.38 |
| 4.01 | KM NO 28 | 375 | Cum | 1,173.4 | ₹4,40,025 |
| 4.02 | KM NO 29 | 187.5 | Cum | 1,218.35 | ₹2,28,440.62 |
| - | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. 2.29A | 30 | Cum | 735.15 | ₹22,054.5 |
| 5.01 | KM NO 28 | 60 | Cum | 750.7 | ₹45,042 |
| 5.02 | KM NO 29 | 30 | Cum | 765.75 | ₹22,972.5 |
| - | Supplying soft murum at the road site, including conveying and stacking complete. 2.29 B | 61.88 | Cum | 732.15 | ₹45,305.44 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
SBD14.pdf
Tender Documents • 1.89 MB
BOQ_2254079.xls
BOQ • 0.38 MB
NIT2QR.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].