Loading…
Loading…
Tender Value
₹54.0 L
EMD Value
₹1.1 L
Closing Date
21 Sept 2026, 4:00 pm5d left
Executive Engineer
Irrigation Division Shopian
Upgradation of Alamgunj LIS block Hermain
2026_IFC_323026_1
eNIT 23 of 2026-27
Open Tender
Civil Works
Percentage
60 days
Shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
Executive Engineer
₹1.1 L
1 Sept 2026
1 Sept 2026
22 Sept 2026
1 Sept 2026
21 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical (Hydraulic excavator) means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soils | 255.47 | cum | 187.3 | ₹47,849.53 |
| 2 | Providing and laying stone soling tightly hand packed including supply | - | cum | 237.9 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 8.45 | cum | 5,202.9 | ₹43,964.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 44.26 | cum | 6,591.25 | ₹2,91,728.73 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.17 | cum | 7,788.4 | ₹63,631.23 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 37.99 | cum | 9,395.7 | ₹3,56,942.64 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 3,940.35 | kg | 123.2 | ₹4,85,451.12 |
| 8 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete. Welded | 4,365.97 | Kg | 138.2 | ₹6,03,377.05 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :
Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 7.82 | cum | 9,027.2 | ₹70,592.7 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 171.32 | Sqm | 286.35 | ₹49,057.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_1086024.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .