| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.3 LAdmitted-Finance | -10.00% | ₹22.3 L | L1 | Admitted-Finance |
| 2 | L2₹24.3 L+₹2.0 L (8.89%)Admitted-Finance BHIWANDI | BHIWANDI | MAHARASHTRA | -2.00% | ₹24.3 L+₹2.0 L (8.89%) | L2 | Admitted-Finance |
| 3 | L3₹24.8 L+₹2.5 L (11.1%)Admitted-Finance | +0.00% | ₹24.8 L+₹2.5 L (11.1%) | L3 | Admitted-Finance |
| 4 | L4₹25.3 L+₹3.0 L (13.3%)Admitted-Finance | +2.00% | ₹25.3 L+₹3.0 L (13.3%) | L4 | Admitted-Finance |
Tender Value
₹24.8 L
EMD Value
₹24,756
Closing Date
6 Apr 2026, 3:00 pmClosed
Dy.Commisnor, BNCMC.
Bhiwandi Nizampur City Municipal Corporation,Kaap Ali,Bhiwandi
Repairing Road excavated for pipeline work in Bhiwandi Municipal Area.
2026_BNMC_1290344_1
BNCMC/WSD 51/2026_3
Open Tender
General Repair Works
Percentage
365 days
Bhiwandi Nizampur City Municipal Corporation, Kaap
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹24,756
10 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1repairing road excavated for pipeline work in bhiwandi municipal area for year 2026-2027 | |||||
| 2Providing, laying,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate,watering and compacting with Vibratory roller. to the required density. By Mechanical Means-Grading I (Using Screening Type A (13.2) mm Aggregate) (SSR 2022-23 - 129/3.19) | |||||
| 3Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30 grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrives at rates. (SSR 2022-23 - 146/3.35b) | |||||
| 4Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry/Hungry B.T.surface 3kg/10sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) (SSR 2022-23 - 141/3.31) | |||||
| 5BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading1,premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hotmix plant as per IRC-272009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant ,Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete--Bitumen 3.30% of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates) (SSR 2022-23 - 155/3.42) | |||||
| 6BITUMINOUS CONCRETE:-Providing and laying bituminous concrete using crushed aggregates of grading 1,premixed with bituminous binder @5.20 percent by weight of total mix and filler, transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime/ tack coat.For Bitumen of specified grade--USING Batch mix type hot mix plant with SCADA,Sensor Paver,Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) (SSR 2022-23 - 158/3.48) | |||||
| 7Providing and fixing heavy duty inter locking concrete Rubber mould glossy paving blocks of 80 mm thickness of having a strength of 400 Kilogram/Sq.cm. of approved quality and shape on a bed of crushed sand of 25 to 30 mm thick including skirting joints and cleaning etc. complete. (using 100% crushed sand) (SSR 2022-23 - -1041/33.54) | |||||
| 8Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying / pumping,compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface,only.Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batchmix plant (Panmixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) (SSR 2022-23 - 828/24.04) | |||||
| 9Excavator ( Tata Hitachi EX100) (SSR 2022-23 - 547/11) | |||||
| 10Carporation charges 5% | |||||
stage.html
html • 0.03 MB
technical_2218204.pdf
techsummary_2218204.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
3-b1.pdf
Tender Documents • 1.59 MB
BOQ_2218204.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .