Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹8.4 L+₹71,460 (9.33%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.5 L+₹88,320 (11.5%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P. M. COOLING AND ENGINEERING CO L1 | MIR ENTERPRISE L3 | M.S. COOLING & ENGINEERING CO. L2 |
|---|---|---|---|---|---|---|
| 1.00Day to day Comprehensive preventive and corrective maintenance of the following Air Conditioning Units installed at Adminitrative complex , Nimtouri, Purba Medinipur. | ||||||
| 1.01 | 1.5 TR Capacity split type AC Machine - 91 Nos.
(Quantity- 91 Nos x 12 Months = 1092 Unit) | 1,092 | Per Machine/month | 245 ₹2,67,540 Lowest | 285 ₹3,11,220 | 290 ₹3,16,680 |
| 1.02 | 2 TR Capacity split type AC Machine -124 Nos
( Quantity-124 x 12 Months = 1488 Unit) | 1,488 | Per Machine/month | 335 ₹4,98,480 Lowest | 365 ₹5,43,120 | 350 ₹5,20,800 |
| 2.00TERMS AND CONDITIONS FOR AC MAINTENANCE:- | ||||||
| 3.00Objective:- The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is: To prevent fire hazards arising from RAC installations To ensure safety of occupants and the general public To minimize breakdowns and associated downtime and to ensure performance at desired efficiency. Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | ||||||
| 4.00A. Scope of work:- The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split, Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point (Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and replacement of all spare parts and components. | ||||||
| 5.00A.1 General Requirements 1.1 Spare Parts & Components and activities Covered The contract includes repair/replacement of: Compressor Blower motor / fan motor Condenser & evaporator coils P.C.B. and Power Supply Card, wherever applicable. Copper tubing and piping Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant) Relays, thermostats, contactors Remotes Air filters Electrical wiring and controls related to A.C. machines Sheet metal body parts Nitrile Rubber Insulation of different sizes Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for outside ducts etc. Refrigerant gas Drain Pump All replaced materials must be: New and OEM approved quality Approved by Engineer-in-Charge (EIC) prior to installation | ||||||
| 5.01The agency shall: 1.2 Materials & Consumables Provide all consumables required for maintenance, including: Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps etc. Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray Belts for AHU / ductable blowers, Refrigerant All Logbooks and/ or Register as mentioned in this document. | ||||||
| 5.021.3 Tools & Instruments Provide and maintain calibrated tools and instruments, including: Digital multimeter, Digital Clamp-on ammeter Insulation resistance tester, Thermal Imaging Scanner Pressure gauges, Infrared thermometer and Digital Psychrometers Decibel Meter or SPL (Sound Pressure Level) Meter Air velocity meter / anemometer Coil cleaning chemical sprayer Fin comb for condenser/evaporator fins Vacuum cleaner / blower for cleaning indoor and outdoor units High-pressure Water jet pump for condenser coil cleaning Vacuum pump and Refrigerant charging hose set Nitrogen cylinder with regulator for pressure testing Brazing set with gas cylinder Drain line flushing pump Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable wrenches, Hackshaw & Hammer, Electric Drill machine. Insulated ladder Chain pulley block (for heavy equipment where required)etc. | ||||||
| 5.031.4 Uniform and Safety Gear (Applicable only when dedicated manpower is included in BOQ) Ensure all staff use proper uniforms. Provide at least two sets of uniforms and safety gear (helmet, Umbrella, raincoat, gumboots, etc.) to each staff member. The color end embossing should be as per direction of EIC. | ||||||
Tender Value
Refer Docs
EMD Value
₹16,716
Closing Date
25 May 2026, 2:30 pmClosed
SENIOR SUPERINTENDING ENGINEER
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound, Midnapore, Paschim Medinipur
Annual Maintenance (Civil and Electrical) of Administrative Complex, Nimtouri, Purba Medinipur--Comprehensive Maintenance of RAC (Split) AC System of Administrative Building for the period of 1 year
2026_WBPWD_5014110_1
WBPWD/SSE/SWEC/NIQ06/2026-27
Open Tender
ELECTRICAL WORKS M/R
Item Rate
365 days
PURBA MEDINIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹16,716
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER
5 Jun 2026
15 May 2026
27 May 2026
15 May 2026
25 May 2026
20 May 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Day to day Comprehensive preventive and corrective maintenance of the following Air Conditioning Units installed at Adminitrative complex , Nimtouri, Purba Medinipur. | |||||
| 1.01 | 1.5 TR Capacity split type AC Machine - 91 Nos.
(Quantity- 91 Nos x 12 Months = 1092 Unit) | 1,092 | Per Machine/month | - | - |
| 1.02 | 2 TR Capacity split type AC Machine -124 Nos
( Quantity-124 x 12 Months = 1488 Unit) | 1,488 | Per Machine/month | - | - |
| 2TERMS AND CONDITIONS FOR AC MAINTENANCE:- | |||||
| 3Objective:- The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is: To prevent fire hazards arising from RAC installations To ensure safety of occupants and the general public To minimize breakdowns and associated downtime and to ensure performance at desired efficiency. Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | |||||
| 4A. Scope of work:- The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split, Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point (Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and replacement of all spare parts and components. | |||||
| 5A.1 General Requirements 1.1 Spare Parts & Components and activities Covered The contract includes repair/replacement of: Compressor Blower motor / fan motor Condenser & evaporator coils P.C.B. and Power Supply Card, wherever applicable. Copper tubing and piping Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant) Relays, thermostats, contactors Remotes Air filters Electrical wiring and controls related to A.C. machines Sheet metal body parts Nitrile Rubber Insulation of different sizes Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for outside ducts etc. Refrigerant gas Drain Pump All replaced materials must be: New and OEM approved quality Approved by Engineer-in-Charge (EIC) prior to installation | |||||
| 5.01 | The agency shall:
1.2 Materials & Consumables
Provide all consumables required for maintenance, including:
Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps etc.
Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray
Belts for AHU / ductable blowers, Refrigerant
All Logbooks and/ or Register as mentioned in this document. | - | - | - | - |
| 5.02 | 1.3 Tools & Instruments
Provide and maintain calibrated tools and instruments, including:
Digital multimeter, Digital Clamp-on ammeter
Insulation resistance tester, Thermal Imaging Scanner
Pressure gauges, Infrared thermometer and Digital Psychrometers
Decibel Meter or SPL (Sound Pressure Level) Meter
Air velocity meter / anemometer
Coil cleaning chemical sprayer
Fin comb for condenser/evaporator fins
Vacuum cleaner / blower for cleaning indoor and outdoor units
High-pressure Water jet pump for condenser coil cleaning
Vacuum pump and Refrigerant charging hose set
Nitrogen cylinder with regulator for pressure testing
Brazing set with gas cylinder
Drain line flushing pump
Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable wrenches, Hackshaw & Hammer, Electric Drill machine.
Insulated ladder
Chain pulley block (for heavy equipment where required)etc. | - | - | - | - |
| 5.03 | 1.4 Uniform and Safety Gear (Applicable only when dedicated manpower is included in BOQ)
Ensure all staff use proper uniforms. Provide at least two sets of uniforms and safety gear (helmet, Umbrella, raincoat, gumboots, etc.) to each staff member. The color end embossing should be as per direction of EIC. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.83 MB
BOQ_5082063.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .