| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-Finance | L1 | Accepted-Finance Technically and Financially qualified | |
| 2 | L2₹6.3 L+₹84,654 (15.6%)Accepted-Finance | L2 | Accepted-Finance Technically and Financially qualified | |
| 3 | L3₹6.4 L+₹1.0 L (18.5%)Accepted-Finance | L3 | Accepted-Finance Technically and Financially qualified | |
| 4 | L4₹6.4 L+₹1.0 L (18.8%)Accepted-Finance | L4 | Accepted-Finance Technically and Financially qualified | |
| 5 | L5₹6.6 L+₹1.1 L (21.1%)Accepted-Finance | L5 | Accepted-Finance Technically and Financially qualified |
Tender Value
₹7.7 L
EMD Value
₹15,480
Closing Date
20 May 2023, 11:00 amClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER KPDCL DIVISION SHOPIAN NEAR DEGREE COLLEGE SHOPIAN
creation of 200kva sub station alongwith HT/LT network for CT Scan at District Hospital Shopian
2023_PDD_211336_1
EDS/E-TENDER/03 DATED 04-05-2023
Open Tender
Electrical and Maintenance Works
Turn-key
45 days
SHOPIAN
PLEASE REFER TO SBD
8 documents required · 8 mandatory
₹500
EXECUTIVE ENGINEER KPDCL DIV. SPN
₹15,480
22 May 2023
5 May 2023
20 May 2023
6 May 2023
20 May 2023
6 May 2023
6 May 2023 - 6 May 2023
Amount
Loading, Transportation, Installation, Testing and Commissioning of 11/0.433 kV, 3-phase 200 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Al wound ) (Material to be supplied by the department)
Loading, Transportation, Errection, testing & commissioning of ST poles 9 mtr long 410-SP-33 164 Kgs with base plate and cap including transportation as per REC Standard (Material to be supplied by the department)
Loading, Transportation, Errection, testing & commissioning of ST poles 8 mtr long 410-SP-33 119 Kgs with base plate and cap including transportation as per REC Standard (Material to be supplied by the department)
Supply, Transportation, Laying, stringing and binding of conductor including joints with PG clamps of required size 50 mm2 ACSR ( Rabbit)
Providing and laying of 240mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS
Providing & fixing of Suspension/Tension clamps with I-Hooks for 240 sq.mm 3.5 core cable
Providing & fixing of IPC for 240 sq.mm 3.5 core cable
Supplying and erection of GI channel (75x40x6 mm) , GI Angle( 50x50x6 mm), 50X50X6 mm angle support including clamps for Sub-Station Frame as per REC approved Drawings.
Supplying and erection of GI Channel “V’ cross-arm (75 x 40x6mm) with GI Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing V-Cross arm and pole top bracket without making holes in the ST pole as per REC standard for single pole structure. NOTE: Please refer Pole drawings for details
Providing and Fixing of 11 KV pin insulator Complete (Polymer/Porcelain) 5 KN With Pins
Supply,Installation testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply and Installation of 11KV D.O FUSE SET 3 Phase 400 Ampere Horn Gap
Supply and Installation of 11 KV LA SET 9 KVA ,10 KA,LA WITH Polymer ,Porcelain Housing Station Type
Providing and Fixing of Alumunium Thimbles of sizes
Providing and Fixing of Nut & Bolts GI
Providing and Fixing of SL CLAMP (100 KVA)
Supply and Installation of 185 mm² Single Phase Cable,1.1K V Grade, XLPE un armoured FRLS type
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint)
Supply and Installation of Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip.
Identification of assets by marking of Transformer with white paint & marking of poles with Black paint at a height of 2.40 mtr from ground level. (Note : Mention Name of Scheme , Implementing Agency (JKPDD), Year of Implementing (2021-22)
Supply and laying of Cement bottoming 1:2:4 mix as per REC standards 0.45 cum/pole, muffing 20 cm above ground level ,including plaster and curing of concrete in size of 600x600x1800 mm alongwith refilling the pit (the leftover pit after concreting to be filled with soil and boulders) NOTE: Please refer Pole drawings for details
Supply, Installation Testing and Commissioning of LT Distribution Box for 200 kVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Supply, Installation Testing and Commissioning of 11 KV Pilfer resistant metering cubicle for 3 Phase 4 wire metering system made of MS sheet steel thickness not less than 2mm duly power coat painted suitable for indoor as well as outdoor as per the site requiremnet. The cubicle shall be painted through 7-tank process. The external dimensions hsould be adequate. Pannel having two compartments-upper meter compartment and lower CT/PT compartment, provided with synthetic or semisynthetic gasket firmly glued to the surface, dust, weather & vermin proof and shall comply degree of protection as per IP65. Both the chambers having one sided hinged door arrangements. The metering panel shall be provided with two no. MS channels of size 100*50 mm on the front and rear sides duly welded and 4 No. of lifting hooks. It should be possible to take meter reading manually, through CMRI and computer without opening the LV Chamber
Supply, Installation Testing and Commissioning of Single Phase, Single Core, epoxy resin cast Current Transformers suitable for 11 KV copper wound primary type with rated burden 5VA and accuracy class 0.5 or better and confirming to IS2705 (Part I&II) aamended upto date. ISF shall be upto 5. The CT ratio shall be as under: i. 2.5/5 for 25 KVA DT ii. 5/5 for 63 KVA DT iii. 7.5/5 for 100 KVA DT iv. 15/5 for 200 KVA DT v. 20/5 for 250 KVA DT vi. 25/5 for 400 KVA DT vii. 50/5 for 630 KVA DT viii. 75/5 for 1 MVA DT
Supply, Installation Testing and Commissioning of 11 KV/110V three phase epoxy resin cast PT with rated burden 15 VA per phase and accuracy class 0.5 or better and confirming to IS3156 (Part I&II) amended upto date with proper colour coded identification. PTs shall be of uniform insulating and withstand separate source 23 KV pf for one minute.
Supply, Installation Testing and Commissioning of Bus bar details: CTs bus bar: 40*6 mm copper strip or adequate site PTs bus bar: copper wire 8 SWG or 30*0.6 mm copper flat strip to connect PT terminal or adequate size duly insulated by the monoplast tape.
Supply, Installation Testing and Commissioning of PVC Copper wire flexible multi-strand of required size for secondary connections for CT wiring the minimum wire size shall be 4 sq.mm (RYB) and for PT wiring minimum wire size shall be 2.5 sq.mm (RYB)
Supply, Installation Testing and Commissioning of Copper Lugs preferably ring type duly crimpled for termination of wires and tapes
Supply, Installation Testing and Commissioning of Grounding bus of minimum 40 mm copper, 25 cm long fixed to the unit in HV chamber. The CTs, PT meter and 11 KV Cable sheath shall be grounded to the bus through grounding wire (green) of min size 10 sq.mm
Supply, Installation Testing and Commissioning of 3 Ph 3 Wire HT CT/PT operated fully static smart Tri-vector energy meter DLMS compliant category C with RS232 port for modem compatibility. 11 KV /110 V ph-ph (3Ph 3 Wire) meters for measurement of different electrical parameters including active energy (KWh/MWh) Reactive Energy (KVArh/MVArh), apparent energy (KVAh/MVAh) etc (make L&T, Secure, AA)
Supply, Installation Testing and Commissioning of Independent flexible PVC pipes for CT wiring and PT wiring of appropriate size from HT compartment to meter compartment
Supply, Installation Testing and Commissioning of Pedestal made out of MS channel of size 75*40 mm or angle iron of size 65*65*5 mm duly painted as per site requirements for mounting of metering panel including concrete forundation whereever required including cost of nuts and bolts
Supply, Installation Testing and Commissioning of 3 Core 11 KV Aluminium cable XLPE armoured 35 sq.mm including cost of clamp for its fixing whereever required
Supply, Installation Testing and Commissioning of Cable termination kits suitable for 3 x 35 mm2 XLPE Cable (indoor/outdoor)
Supply, Installation Testing and Commissioning of Earthing by wayof 40 mm GI Pipe earthing . Job includes , excavation, enhancement materail and Main Hole Chamber (500x450x600) with frame and cover.
Geo Tagged Photographs of high resolution (Pre and Post Photographs) Both hard and soft copy (for e-compendium) 4 Photographs Per site
Sunbeam Enterprises
Reaching Rays Infra Electricals
southern
UMAR ELECTRICALS
M/s Bhat Engineering Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .