Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.3 LAdmitted-Finance | -25.11% | ₹21.3 L | L1 | Admitted-Finance |
| 2 | L2₹24.2 L+₹2.8 L (13.4%)Admitted-Finance | -15.10% | ₹24.2 L+₹2.8 L (13.4%) | L2 | Admitted-Finance |
Tender Value
₹28.5 L
EMD Value
₹56,920
Closing Date
7 Jul 2026, 4:00 pmClosed
Executive Engineer
Mahore Irrigation Division Dharmari
Restoration of Water Supply Scheme Forest Block Budhan including Providing and laying of HDPE Pipe, Protection Work, repair and renovation of 10000 Glns GSR and Restoration of WSS Chaklas Budhan including providing and laying of Pipe and repair and
2026_IFC_313056_1
e-NIT No. 21 of 2026-27 dated 19-06-2026
Open Tender
Civil Works
Percentage
75 days
Chakslas Budhan
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer
₹56,920
10 Jul 2026
20 Jun 2026
8 Jul 2026
20 Jun 2026
7 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WSS Forest Block Budhan | |||||
| 1.01 | Providing and fixing HDPE pipes complete with HDPE fittings excluding trenching and refilling etc. (external work).
HDPE 63 mm dia. nominal bore | 150 | Mtr | 218.8 | ₹32,820 |
| 1.02 | HDPE 40 mm dia. nominal bore | 300 | Mtr | 99.8 | ₹29,940 |
| 1.03 | HDPE 32 mm dia. nominal bore | 900 | Mtr | 63.9 | ₹57,510 |
| 1.04 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
All kinds of soil : | 217.35 | cum | 479.3 | ₹1,04,175.86 |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth. | 195.62 | cum | 180.55 | ₹35,319.19 |
| 1.06 | Carriage of GI Pipe from Jammu to Site of Work for an average distance of 100 km by Mechanical transport and 1000 M by head load. | 0.55 | MT | 11,055.11 | ₹6,080.31 |
| 1.07 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 6.23 | Cum | 5,202.9 | ₹32,414.07 |
| 1.08 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 4.2 | Cum | 7,275.25 | ₹30,556.05 |
| 1.09 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1.36 | Cum | 9,821.85 | ₹13,357.72 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_1013111.xls
BOQ • 0.46 MB
CORG-SASCIPHE.pdf
PDF • 0.02 MB
CORGENIT21.pdf
PDF • 0.01 MB
CORG-EXTENIT19_21.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .