| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.3 L+₹21,158.73 (1.75%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹12.5 L+₹35,264.54 (2.91%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹14.9 L
EMD Value
₹1.3 L
Closing Date
3 Jul 2026, 3:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Construction of tin shed and other improvement works at the cremation ground located in Ward No. 18, Mau. Basth.
2026_DOLBU_1148317_256
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,486
Municipal Corporation
₹1.3 L
29 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 43.2 | Cum | 150 | ₹6,480 |
| 2 | Providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size ) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26 Chapter No-06 SI No. 3 Spec. No. 4.1) | 4.32 | Cum | 5,650 | ₹24,408 |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 6.56 | Cum | 8,100 | ₹53,136 |
| 4 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (PWD SOR 2025-26, Chapter-5, Item No.12) | 6.78 | Cum | 8,900 | ₹60,342 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).(PWD SOR 2025-26, Chapter-5, Item No.11 Spec. no. 5.2) | 1.52 | Cum | 9,000 | ₹13,680 |
| 6 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 11.67 | Qtl | 7,800 | ₹91,026 |
| 7 | M-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work add extra to item No.1 to 4 above for super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12cm( PWD SOR 2025-26, chapter-5, SI No. 2+5) | 4.61 | cum | 5,950 | ₹27,429.5 |
| 8 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand ( Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level...... All complete.(PWD/SOR 2025-26 Chapter No-07 SI No. 2) | 3.6 | cum | 200 | ₹720 |
| 9 | Earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate) | 19.45 | Cum | 374 | ₹7,274.3 |
| 10 | Grandular Sub-base with well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). | 8.66 | Cum | 3,234 | ₹28,006.44 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
TD.pdf
Tender Documents • 6.85 MB
BOQ_2180333.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .