Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance 111 MINI SHOPPING COMPLEX NEAR HOTEL ASIA NEHRU MARKET JAMMU JAMMU KASHMIR 180004 | JAMMU | JAMMU AND KASHMIR | 180004 | L1 | Accepted-Finance Being lowest bidder | |
| 2 | L2₹2.0 L+₹4,010 (2.03%)Rejected-Finance 235 YARD 6 NARWAL JAMMU JAMMU KASHMIR 180001 | JAMMU | JAMMU AND KASHMIR | 180001 | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹2.1 L+₹12,950 (6.55%)Rejected-Finance | L3 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
Closing Date
8 Oct 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer MID Jammu
Repair to electric components of 60 HP pumping unit no III along with allied works at LIS Didwara and Repairs to electric components of 50HP pumping unit-II along with allied works at LIS Jand nud.
2021_IFC_140576_1
MID/J/e-NIT/2021-22/77
Open Tender
Repair and Maintenance Works
Lump-sum
15 days
Didwara Jandi nud
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
Exempted
Jammu
13 Oct 2021
21 Sept 2021
9 Oct 2021
21 Sept 2021
8 Oct 2021
27 Sept 2021
21 Sept 2021 - 8 Oct 2021
25 Sept 2021
180 days
Amount
Repair to electric components of 60 HP pumping unit no III along with allied works at LIS Didwara
Repair to 60 HP motor coupled with 4 cusec Horizontal Centrifugal Pump of unit No-III by way of disconnecting all electrical connection, coupling pulley with nuts and bolts and foundation bolts of the motor at LIS Didwara by using suitable tool and tackles for shifting of motor from pump house to road site. Then loading in carriage vehicle and shifting the motor from LIS to workshop for rewinding. Rewinding of 60 HP motor of Unit no-III of LIS Didwara at workshop by way of extracting out old damaged winding manually and cleaning of stator slots. Complete rewinding of the stator by using standard copper wire of requisite gauge. Varnishing after rewinding of stator. Repair to rotor shaft by way of welding, turning and finishing to required size. Providing and fitting of two number bearings (6213) on driving and non-driving end. Assembling the motor completely and pre-testing the motor satisfactorily. Shifting back the motor to the road side near lift irrigation station by carriage vehicle and then by manual labour to the pump room. Coupling of the motor -pump with the help of coupling pulley with coupling nuts and rubber bushes by using tools and tackles and manual labour. Fixing of foundation bolts of the motor to the base frame. Testing of the motor on full load. Complete job includes the cost of the material, labour charges (both skilled & unskilled), transportation charges (both Mechanical & Manual) of motor from site to workshop and back to the site. Complete Job Dismantling of 60 HP starters of unit no I & III by way of disconnecting all the electrical connections of starters then draining of the oil from the starters tank at LIS Didwara. Repair to 60 HP starter by way of extracting the damaged worn out parts. Repair to Tripping system by brazing and finishing required size, Providing and fitting of no voltage coil, overload relay, moving and fixed contact point. Replacement of worm out thimbles nuts-bolts and internal leads duly soldered properly. Reassembling the same at site, topping up of starters with 5 ltrs of oil. Complete job includes cost of material and labour charges. Complete Job
Rebate on Old Parts
Repairs to electric components of 50HP pumping unit-II along with allied works at LIS Jand nud.
Decoupling of pump unit no II from 50 hp motor and then dismantling of motor from the base frame. Carriage & shifting of dismantled motor on head load to roadside using manual labour and then to workshop by carriage vehicle. Rewinding and repairs to 50 hp x 1480 rpm motor of pumping unit no II by extracting out old damaged winding manually and cleaning of stator slots. Inserting of insulation papers in slots, complete rewinding of the stator by using standard copper wire of requisite gauge. Making of connection coils in star delta. Tightening /locking of coils into the slots by using glass fiber wedges. Complete varnishing of the stator and allowing to completely dry. Repair to rotor shaft by way of welding the positions of bearings and coupling pulley, turning and finishing making the area smooth and balanced. Providing and fitting of two number new bearings 6313 on driving and 6213 non driving end, nuts and bolts. Repairs to 50 HP starter of unit no- II at LIS Jandi nud by way of extracting the damaged worn out parts. Repair to tripping system by brazing and finishing required size, Providing and fitting of no voltage coil, overload relay, moving and fixed contact point. Replacement of worn out thimbles nuts-bolts and internal leads duly soldered properly. Topping of starter with 10 liters of fresh transformer oil. Repairs to 250 kva voltage stabilizer installed at LIS Jandi nud by way of disconnecting incoming and outgoing power connections from voltage stabilizer. Draining of existing transformer oil in barrel. Repair to voltage stabilizer at workshop by way of extracting out the inner frame, extracting out the 2 No’s damaged coils and rotary switches. Rewinding of 2 No’s coils using standard quality copper wire of appropriate gauge, varnishing with two coats of standard make varnish and proper insulation. Servicing of third coil. Replacement of gasket, providing/fitting of 2 no’s new rotary switches and refitting on the Bakelite plate. Filtration of existing transformer oil and toping up with 50 liters of fresh transformer oil after cleaning the tank to remove carbon deposits. Shifting of the repaired voltage stabilizer to installed position at LIS Jandi nud by mechanical transport. Installation of the voltage stabilizer by connecting incoming and outgoing power cables. Testing of voltage stabilizer on no load and full load conditions. Job includes cost of material including rebate on old copper scrap/ material, labour charges, hire charges of tools and tackles, carriage charges, installation and testing charges at site. The job includes loading, un-loading, manual labour, carriage charges of vehicle (to & fro), tools & tackles, cost of materials, installation& testing charges at site. Complete job.
Rebate on Old Parts
Vaibhav Engineers and Technocrates
R M ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .