| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 CrAccepted-AOC 204 LOTUS PARK NEHRU NAGAR THANE MAHARASHTRA INDIA | THANE | MAHARASHTRA | 400601 | ₹9.0 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹9 CrRejected-AOC TANGLA UDALGURI ASSAM | UDALGURI | ASSAM | 784113 | ₹9 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Pabitra Boro L2 | SARAIGHAT ENGINEERS L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling with approved material.
B) Mechanical Means
(II) With dewatering
ii) Depth 3 m to 6 m | 573.91 | Cu.m. | 93 ₹53,373.63 | 93 ₹53,373.63 |
| 2.00 | Providing and constructing temporary island for construction of well foundation complete as per technical specification.
(c ) For 8m dia. Well
iii. Depth of water above 3.0 m upto 4.0 m | 2 | Each | 2,36,616 ₹4,73,232 | 2,36,616 ₹4,73,232 |
| 3.00 | Providing and constructing one span service road to reach island location from one pier location to another pier location | 60 | R.M. | 3,710 ₹2,22,600 | 3,710 ₹2,22,600 |
| 4.00 | Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and technical specification. | 9.42 | M.T. | 1,14,968 ₹10,82,998.56 | 1,14,968 ₹10,82,998.56 |
| 5.00 | Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.
A) Well curb
ii) RCC M25 Grade
Case II: With Batching Plant, Transit Mixer and Concrete Pump | 159.66 | Cu.m. | 9,987.56 ₹15,94,613.83 | 9,987.56 ₹15,94,613.83 |
| 6.00 | Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.
B) Well steining
iii) RCC M20 Grade
Case II: With Batching Plant, Transit Mixer and Concrete Pump | 1,927.75 | Cu.m.. | 8,500 ₹1,63,85,875 | 8,500 ₹1,63,85,875 |
| 7.00 | Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork..
C) Bottom Plug
i) PCC M20 Grade
Case II: With Batching Plant, Transit Mixer and Concrete Pump | 394.77 | Cu.m. | 8,200 ₹32,37,114 | 8,200 ₹32,37,114 |
| 8.00 | Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.
D) Intermediate plug
i) PCC M20 Grade
Case II: With Batching Plant, Transit Mixer and Concrete Pump | 44.33 | Cu.m. | 7,900 ₹3,50,207 | 7,900 ₹3,50,207 |
| 9.00 | Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.
E) Top plug
ii) PCC M20 Grade
Case I: Using Concrete Mixer | 24.63 | Cu.m. | 6,530 ₹1,60,833.9 | 6,530 ₹1,60,833.9 |
| 10.00 | Sand filling in wells complete as per drawing and technical specifications | 1,194.56 | Cu.m. | 1,511 ₹18,04,980.16 | 1,511 ₹18,04,980.16 |
Tender Value
₹9 Cr
EMD Value
₹18 L
Closing Date
31 Jul 2025, 2:00 pmClosed
CE (Roads), PWRD, Assam, Chandmari, Ghy-3
O/O The CE (Roads), PWRD, Assam, Chandmari, Ghy-3
STBR/RIDF-XXXI/DIMORIA-01/26 Construction of RCC Bridge over Digaru River at Moupur (Span 3x30 m) under Mukhya Mantrir Unnata Paki Path Nirman Achani (MMUPPNA)under RIDF-XXXI for the year 2025-26
2025_PWD_45554_26
CE/STBR/09/NIT/RIDF-XXXI/2025 26/1 Dated 24-06-2025
Open Tender
Civil Works – Roads
545 days
Dimoria
Please refer Tender documents.
5 documents required · 5 mandatory
₹18,000
₹18 L
Yes
O/O The CE (Roads), PWRD, Assam, Chandmari, Ghy-3
7 Feb 2026
17 Jul 2025
1 Aug 2025
17 Jul 2025
31 Jul 2025
17 Jul 2025
17 Jul 2025 - 31 Jul 2025
18 Jul 2025
Amount
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B) Mechanical Means (II) With dewatering ii) Depth 3 m to 6 m
Providing and constructing temporary island for construction of well foundation complete as per technical specification. (c ) For 8m dia. Well iii. Depth of water above 3.0 m upto 4.0 m
Providing and constructing one span service road to reach island location from one pier location to another pier location
Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and technical specification.
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. A) Well curb ii) RCC M25 Grade Case II: With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. B) Well steining iii) RCC M20 Grade Case II: With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork.. C) Bottom Plug i) PCC M20 Grade Case II: With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. D) Intermediate plug i) PCC M20 Grade Case II: With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. E) Top plug ii) PCC M20 Grade Case I: Using Concrete Mixer
Sand filling in wells complete as per drawing and technical specifications
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. F) Well cap ii) RCC Grade M25 Case I: Using Concrete Mixer
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. b) Clayey soil ( 8m dia. Well ) (i) Depth upto 3.0 M
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. b) Clayey soil ( 8m dia. Well ) (ii) Beyond 3.0 m upto 10.0 m depth
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. b) Clayey soil ( 8m dia. Well ) (iii) Beyond 10m upto 20m Adding for dewatering @ 5% of cost, if required
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is rekonewed from bed level. b) Clayey soil ( 8m dia. Well ) (iv) Beyond 20m upto 30 m Adding for dewatering @ 5% of cost, if required
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (G) RCC Grade M-30 (b) Height 5m to 10m Case II-With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (F) RCC Grade M-25 (b) Height 5m to 10m Case II-With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MORTH&S Specification complete as per drawing and approved technical specification.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. E. PSC Grade M-40 For T-beam & slab Height above 10m
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
Bituminous wearing course: Providing and laying Bituminous wearing course comprising of tack coat with bitumen emulsion CSS-1h as per APWD SOR item no 5.2 & MOSRT&H Specification Nos 503 0.6mm thick mastic asphalt as per APWD SOR item no 14.5 & MOSRT&H Specification Nos 515 & 2702 and 2 layers of 25 mm thick Asphalt concrete including of close Graded Premix Surfacing(CGPS) materials with Type -a aggregate as per APWD SOR tem no 5.11 & MOSRT&H Specification Nos 512 including all lead and lift as directed.
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Drainage Spouts complete as per drawing and Technical specification
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular material
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. )
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 With Stone/ Boulder
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depthof 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval . Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2( two) each of Design& Drawing of each bridge to be submitted for approval and 8 ( eight)copies after approval of competent authority. including providing and erecting informatory sign board as per norms of NABARD
Pabitra Boro (BID ID -274146)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_72441.xls
BOQ • 0.25 MB
175960560.pdf
Tender Documents • 2.06 MB
175960561.pdf
Tender Documents • 10.41 MB
175960562.pdf
Tender Documents • 0.56 MB
175960564.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid